Hull looks like battleship style
Yes, the forward section looks rather impressive. Do you have any good CAD models of this ship?
These ships are not very fast though. The bow thrusters indicate requirement for independent movement from dock
Powered by 2 Cummins KTA50G3 diesel engines and Kirloskar 1 MV AC generators. I read somewhere that these ships will be performing mine counter measure role. That is their only combat deployment job. Rest of their jobs are all auxiliary & support roles.
Do we expect a hill mounted sonar on the ship?
Yes. If we expect these ships to do MCM jobs & also provide training to sailors for ASW then hull mounted sonars are a must.
Looks higher in quality of finish than Gormint PSU Shipyards.
Completely agree. L&T Kattupalli is a great shipyard.
In the near future MDL & GRSE will use up their capacities for the P-17A, P-17B & eventually P-18 class ships. CSL will be busy with follow-on aircraft carrier. HSL will remain busy with the DSV & FSS ships.
Navy is cultivating GSL with the Talwar class Batch 4 orders. By the end of that project GSL can be said to be capable of making frigates. This will take some workload off from MDL & GRSE.
The capability spectrum of Indian shipbuilding industry looks like this:
Aircraft carriers - CSL
LHDs / LPDs - CSL, L&T
SSNs / SSBNs - SBC Vizag, L&T (?)
SSKs - MDL, L&T, HSL (?)
Destroyers - MDL, GRSE, CSL
Frigates - MDL, GRSE, CSL, GSL
Corvettes - MDL, GRSE, CSL, GSL, HSL
Diving Support Vessels / Hospital ships / Survey ships - MDL, GRSE, CSL, GSL, HSL, L&T, ABG
ASW-SWCs / OPVs / PCVs / Fast patrol / Interceptors - MDL, GRSE, CSL, GSL, HSL, L&T, ABG, Titagarh
Not bad overall. There are certain types of ships that are dependent on just 1 or 2 shipyards. If we could have more diversification, we could reduce workloads on these shipyards & reduce risks in case of accidents/sabotage.
It would've been great if L&T was also given an order of 2 ships of Talwar class Batch 4. That would've given us another shipyard capable of making frigates. L&T went from laying down the keel to launching the 3750-ton MPV in 19 months. GSL took 42 months to launch the 4000-ton Triput frigate. L&T is certainly capable.
I imagine budgetary constraints got in the way.