Chandrayaan-2 : Updates

It was supposed to reach 400meters after soft-brake, But it only reached 1Km and looks like landing velocity become higher and it crashed
 
Huge disappointment....but better luck next time. Nothing to be disheartened about.

We were able to project an object 388k KM away. Tell me how is that disappointing? It is another step in Indian Innovation's long journey. Things dont go our way each time. The way we react in adversity shows our true form. Best wishes to the team.
 
We were able to project an object 388k KM away. Tell me how is that disappointing? It is another step in Indian Innovation's long journey. Things dont go our way each time. The way we react in adversity shows our true form. Best wishes to the team.
Failure shud be used as a stepping stone to success. Learn, improve and do better each time.
 
Looks like it didnt slow down enough vertical speed and horizontal speed it slowed down bit too much. It is the automated final descent level which screwed it. Untill then everything was smooth.
 
Yes, even I think so as it deviated from the trajectory and its vertical velocity was higher.
It did not , there is the predicted trajectory and a permissable margin of deviation from the same. The lander was within the permissible limits infact close to predicted trajectory.

Most probably the landing producing some hiccups
 
ISRO Chairman Dr. K. Sivan : Everything went normal upto the altitude of 2.1 km from surface. Then signal was lost. Data is being analyzed. Will update later.