LCA AF Mk2 (Medium Weight Fighter) - News and discussions

Canopy RFP

Tender Ref. No.: D/IMM/5461/7R/1221/2026

Sub: Request for quotation(RFQ) for supply of Raw Materials for LCA MK II AF Programme.

Stretched Acrylic Sheet MIL-PRF-25690B Class 2 12mm(Tol +/-0.5mm) Thick X 1000 mm X 2000 mm
Quantity: 8

Delivery: 6 months
Is this for PV1 or PV2?
 
  • Like
Reactions: spice
Canopy RFP

Tender Ref. No.: D/IMM/5461/7R/1221/2026

Sub: Request for quotation(RFQ) for supply of Raw Materials for LCA MK II AF Programme.

Stretched Acrylic Sheet MIL-PRF-25690B Class 2 12mm(Tol +/-0.5mm) Thick X 1000 mm X 2000 mm
Quantity: 8

Delivery: 6 months
this is what i got from gemini "Aviation-Grade Stretched Acrylic Sheet (MIL-PRF-25690, Class 2). This specialized, biaxially oriented PMMA offers superior crack-propagation, craze, and solvent resistance, and is widely used for aircraft windscreens, canopies, and pressurized cabin windows"
 
Bid Number: GEM/2026/B/7729639
Design, Development and Supply of Removal or Installation Trolley for AESA Radar AAAU for the LCA AF MK2 Aircraft
Project duration: 12 months
Uttam radar weighs 90 kgView attachment 52761

View attachment 52762View attachment 52763
If these orders are being given now, I doubt that the 1st proto will be rolled out anytime in 2026, or even by 2027, but if these are for the 2nd proto, then that changes the whole scenario.
 
Design, Development & Certification of Interface Control Definition - Database Management (ICD-DBM)
Bid Number: GEM/2026/B/7779831

Statement of Work (SOW) for Design & Development and Certification for ICD Database Management Software for LCA AF Mk2 & Future Variants

Software design, development and certification for ICD-DBM software are planned over 18 months

Database updates for MK1 & MK1A (if any ICD changes are received)



Design, Development and Certification of Mission Planning and Debrief System (MPDS)
Bid Number: GEM/2026/B/7785150

Statement of Work (SOW) For Design, Development & Certification of Mission Planning and Debrief System (MPDS) For LCA AF Mk2, AMCA & Future Variants
Project duration: 18 months

MPDS is a state-of-the-art Mission planning & multi-aircraft debrief tool which assist in detailed Mission Planning, Training (simulation) & Debrief for LCA AF Mk2 & its future variants, A Mission Planning and Debrief System is an integrated system which acts as the bridge between the pilot, aircraft and various mission scenarios, enabling efficient planning, execution, and learning.
 
One of the problems with MK1 was its abrupt increase in area in the forward section which resulted in high supersonic drag. This is the very reason they made the MK2 longer than MK1.
As far as I'm aware, the Tejas Mk1a was elongated to the Mk2 to have a larger and more powerful engine, increase it's internal fuel capacity and add in canards, can you explain how the tejas mk1a breaks the area rule compared to other delta wing jet or mk2? Cause I don't notice it much apart from the longer front section.