If this thing succeeds we will literally juice it for the next 40-50 years to power even 6th gen prototypes when they come in far future.
at 13:54 he says the engine would be ready for flight testing by 2034 if we sign the contract at the end of this year, this is making me rethink with our decision going forward with Safran.
Gupta points out that DRDO and GTRE’s original Kaveri engine stalled at a modest 40 kN thrust - “hardly anything” for contemporary fighters - but has now been revived with an 80 kN target. The idea is to use Kaveri as a technology demonstrator and then scale up, learning by doing despite the enormous cost and labour demands of engine development—estimated at 10–15 billion dollars per modern design.
A contract for 212 GE F404 engines will feed the Tejas Mk1A/1A+ fleet, with nine engines already delivered but further supplies delayed by supply chain issues rather than political will.