I know about this...
It's not happening in Mumbai or Delhi (only widebodies and Boeings here) so I won't be able to show the planes themselves, but iirc VT-PPx series till now has been operated in the same configuration that DRDO got it in... With only maintenance works being done by AIESL only.
Now in preparation for the AWACS conversion, at Nagpur (most likely but Thiruvananthapuram also eligible candidate) AIESL will remove seats, front and aft galleys removed, lavs revamped or removed, overhead bins removed, and cabin trim will be removed too..
AIESL has certification to do this and more (structural repairs, etc). But cutting massive holes in the frame is where the line is drawn. STC would have been possible in my opinion but investment for that hasn't been done. If we had an STC, I'm sure we'd have them converted by now.
Cabin announcement system, lighting, will be removed too.
They will also do a C-check very likely. AIESL is also doing things like outflow valve cleaning, boroscope inspection, etc...
This will take around 2-3yrs for all the planes.
It will be done in rolling manner with each plane being delivered to Airbus as the conversions are finished... Airbus expects the planes in this condition to begin with their structural modifications.
During this time DRDO CABS and Adani will be finalizing the requirements for mission systems, operator consoles, integration rigs, etc...
2031 onward Airbus will begin structural modifications in Spain.
It will involve them having to reinforce the fuselage crown and bulkheads where antenna will be mounted...
They will also install the dorsal plank above fuselage, it will involve cutting the airframe and installing titanium supports...
They will also upgrade the generator systems since current ones only can make 180kVa (90kVa from APU not included)
Since they're the OEM, they will upgrade it to 600kVa range.