Projects waiting for AoN (people can add to the list.)Some upcoming naval projects:
1. 08 Next Generation Corvettes: AoN accorded. RFP by mid 2024 and contract signing by mid 2025. It will be divided between L1 and L2 with L1 building 5 and L2 building 3 ships respectively.
2. 14 Fast Patrol Vessels for ICG: RFP out.
3. 06 NGOPV for ICG: RFP out.
4. 01 Cadet Training Ship for ICG: RFP out.
5. 01 Research Ship for Polar Oceanographic Research Center: RFP out.
6. 02 Multi Purpose Vessels for IN: RFP expected in 2024.
7. 05 Next Generation Survey Vessels: RFP expected in 2025.
8. 120 FIC for IN: RFP expected in 2024.
9. 01 National Hospital Ship of IN: RFP in 2025.
10. 18 Fast Patrol Vessels for ICG: RFP in 2025.
11. 22 Fast Interceptor Boats for ICG: RFP in 2027.
12. 04 LHD: RFP expected in 2025.
13. 21 Next Generation FAC for IN: RFP expected in 2024.
Why is the LHD/LPD so late ?Some upcoming naval projects:
1. 08 Next Generation Corvettes: AoN accorded. RFP by mid 2024 and contract signing by mid 2025. It will be divided between L1 and L2 with L1 building 5 and L2 building 3 ships respectively.
2. 14 Fast Patrol Vessels for ICG: RFP out.
3. 06 NGOPV for ICG: RFP out.
4. 01 Cadet Training Ship for ICG: RFP out.
5. 01 Research Ship for Polar Oceanographic Research Center: RFP out.
6. 02 Multi Purpose Vessels for IN: RFP expected in 2024.
7. 05 Next Generation Survey Vessels: RFP expected in 2025.
8. 120 FIC for IN: RFP expected in 2024.
9. 01 National Hospital Ship of IN: RFP in 2025.
10. 18 Fast Patrol Vessels for ICG: RFP in 2025.
11. 22 Fast Interceptor Boats for ICG: RFP in 2027.
12. 04 LHD: RFP expected in 2025.
13. 21 Next Generation FAC for IN: RFP expected in 2024.
A total 43 vessels are under construction out of which 41 are being built indigenously. Also, a contract for further 20 vessels has already been signed. They will also come under construction very soon.So, how many frontline ships in the process of being built currently & also in the pipeline?
Also very likely new IAC2 order will also be given since its repeat.
It got cancelled twice. Aside from RFI which was released 3 years back there has been no progress whatsoever. Though shipyards are very positive about getting the RFP in 2025.Why is the LHD/LPD so late ?
This is the first time I am hearing about Next Generation Survey Vessels. Although it was mentioned by GRSE that they are expecting the RFP in 2025, I think they meant the RFI. The RFI will come in 2024 - 2025 followed by RFP.05 Next Generation Survey Vessels: RFP expected in 2025.
Two warships of different classes were launched into the water, while the keel of a third vessel was laid on Tuesday at Larsen & Toubro (L&T) shipyard at Kattupalli in Chennai. All these are being built by Kolkata-based defence shipyard Garden Reach Shipbuilders and Engineers Ltd (GRSE).
The ships launched were Anjadip, the 3rd Anti-Submarine Shallow Water Craft (ASWSWC), and Sanshodhak, the 4th Survey Vessel Large (SVL) while the keel was laid for the 7th ASWSWC, GRSE said in a statement. Part of the construction has been sub-contracted to L&T Shipbuilding.
The P16As go to Mumbai Naval Dockyard. Are you sure they have changed bases?Now, it seems ENC has:
03 P-15 class
03 P-17 class
03 P-16A class
03 Rajput class (07 P-17A will replace them).
And WNC has:
02/04 P-15B class
03 P-15A class
06/10 P11356