ADA AMCA - Advanced Medium Combat Aircraft

  • Thread starter Thread starter Tarun
  • Start date Start date
Statement of Work for the Design, Development and Supply of Auxiliary Engine Control Switch (AECS) for AMCA

Project Duration: 24 months.

AMCA is configured with single lever throttle controlfor twin engine operation. This single lever TQA enables usage of un-split throttle grip. This TQA drives both engines (LH and RH) together during its operation. In case of individual engine operation such as single engine starting/operation/ shutdown, Auxiliary Engine Control Switch (AECS) is proposed to be used. The AECS functionalities includes OFF, IDLE, NORM and FIX, these positions are necessary to manage individual engine control on AMCA aircraft.

Auxiliary Engine Control Switch (AECS) is an analog hardwired device that shall be interfaced with engine FADECs and EEMS. AECS is located on the LH-Console of the cockpit, beside the TQA. It also has 2 lamps on LH and RH control knobs respectively for Engine fault indication.

AECS.jpg​
 
Last edited:
Some global players, including our adversaries, have made progress in fifth-generation combat programmes. We take that development seriously and factor it fully into our planning. But I would not measure the air balance only by comparing generations of aircraft.

Our capability-centric approach means that what determines outcomes in the air is not any single aircraft. It is the combined effect of sensors, weapons, electronic warfare, networks and trained air warriors operating as one system. That is the lens through which we approach both questions: when we will field our own fifth-generation fighter, and how we will hold our edge until then.

Our fifth-generation capability will come through the Advanced Medium Combat Aircraft, being developed by DRDO with the IAF actively involved. The Cabinet Committee on Security has sanctioned the programme’s milestones and timelines. The induction is slated for the next decade.

The programme’s industrial foundation has been widened through the industry-driven Execution Model. The IAF reviews the programme regularly with all stakeholders because we are clear that its timely progress is essential.

The first is the fleet roadmap I have already outlined: an upgraded Su-30MKI fleet, the MRFA in an early timeframe, and the LCA Mk-1A, with 180 aircraft contracted, to rebuild squadron strength.

The second is to deny an adversary’s stealth platforms the advantage they seek. Stealth is not invisibility. Extending the distributed sensor network I described earlier, we are building a networked counter-stealth capability. VHF and passive radars are being inducted, multi-static radars are under development, and ground-based and airborne sensors are being fused, so that a target detected by one sensor is correlated by another and tracked by the network.

The third is reach without exposure. Long-range precision and stand-off weapons, combined with electronic warfare and self-protection suites, allow us to hold targets at risk deep in hostile territory without exposing our platforms to the densest defences. Operation Sindoor demonstrated what this combination can achieve.

Also, the arrival of an aircraft is not the arrival of a capability. Turning new fighters into operationally meaningful squadrons takes pilot conversion, maintenance ecosystems, weapon integration, infrastructure, doctrine and years of hard flying. We watch these markers closely, and we judge capability on that basis rather than on headline numbers. And, as I mentioned, we are already looking beyond the fifth generation.

Until the AMCA joins the force, and long after, the IAF will remain a credible, networked and resilient force, fully capable of meeting the challenges the nation faces.

The third element is the development of the LCA Mk-II and the Advanced Medium Combat Aircraft, our fifth-generation fighter. The IAF is actively involved in both programmes, and together they will boost our capability significantly in the coming decade.

 
Three contenders submit bids to ADA for ₹15,000 cr AMCA prototype development

Contenders vie for AMCA prototype contract; technical evaluation begins next

The three shortlisted private sector-led contenders vying for the ₹15,000-crore project to develop prototypes of the indigenous fifth-generation fighter jet, the Advanced Medium Combat Aircraft (AMCA), have submitted their individual bids to a high-level review committee constituted by the Ministry of Defence.

Industry sources said the three contenders — L&T-led consortium of BEL and Dynamatic, Tata Advanced Systems Ltd (TASL), and Bharat Forge-led consortium of BEML Ltd, and Data Patterns — submitted their individual bids by Friday, the deadline for submission.

 
L&T should be winning this with tata in 2nd, maybe Tata can get a 2nd line once the LCA mk2 starts manufacturing(whenever that happens lmao(tata also has a decent relationship with the US cause of C130J parts and apache fuselage production.
Three contenders submit bids to ADA for ₹15,000 cr AMCA prototype development

Contenders vie for AMCA prototype contract; technical evaluation begins next

The three shortlisted private sector-led contenders vying for the ₹15,000-crore project to develop prototypes of the indigenous fifth-generation fighter jet, the Advanced Medium Combat Aircraft (AMCA), have submitted their individual bids to a high-level review committee constituted by the Ministry of Defence.

Industry sources said the three contenders — L&T-led consortium of BEL and Dynamatic, Tata Advanced Systems Ltd (TASL), and Bharat Forge-led consortium of BEML Ltd, and Data Patterns — submitted their individual bids by Friday, the deadline for submission.