Arihant-class SSBN - News & Discussions

Nice find!

I don't think we can conclusively say yet if these are S-5 SSBN sections, but they certainly appear to be maritime vessel-related as they seem to be stored in position to be loaded on to a barge. Could be some unrelated industrial modules as well, though.

The size (as measured by you) is also interesting.

View attachment 54201
I had the same doubts but A.M Naik heavy engineering is known to be the facility where hull sections are made and then transported to SBC using a barge
L & T-built Pressure-Hull Sections.JPG

Also these are visibly cylindrical in shape, the second one looks like tail end section of a submarine
ewcrvy44.png
 
Last edited:

Great find. I am reasonably confident that these are modules of the 1st S5 SSBN's hull. These modules measure from 8.5-11m in length. Assuming the S5 class is ~140-150 m in total length, we will need 14-15 such modules.

It was reported that construction of the 1st S5 sub started on December 2025. So, in ~10 months we have 4 modules ready to ship to SBC Vizag for outfitting. At this rate we should have all the modules by ~40 months (3 years, 4 months). Setting up the reactor, propulsion, sensors, VLS tubes etc. at SBC will take 1.5 years minimum. So that's 5 years in total. Then outfitting & then joining the modules. That will be about 6.5-7 years. Then 2-3 years of harbor trials & sea trials. Then another 2-3 years of weapon trials from the sub. Full service entry in late 2030s.

IN has ordered the construction of just the 2 subs for now with plans of having a fleet of 6 eventually. I hope the orders come in time. Don't want a stagnant production line like we have with the destroyers.
 
I had the same doubts but A.M Naik heavy engineering is known to be the facility where hull sections are made and then transported to SBC using a barge

Of course, but L&T produces a whole lot of engineering goods at the Hazira plant in adjoining units. These pieces are likely to be submarine-related though, just can't say for sure. Wish they laid them on the side like this:

096 and 095 SSN - Copy.jpg


I've been seeing this image for over a decade now, originally popularized by Prasun Sengupta's blog. These are not really images of L&T facility though, neither is this boat Arihant. It's either a Russian or French boat, I remember seeing the original pic but can't find it now.

I don't think any pics of the module-construction facility's interior exist. This CAD image is probably the closest we'll get:

L&T Hazira.jpeg

Also these are visibly cylindrical in shape, the second one looks like tail end section of a submarine
View attachment 54208

Yep.

It was reported that construction of the 1st S5 sub started on December 2025.

Actually, the report just said the first two units of S5 had "already begun construction". The report was published in December 2025 yes, but it doesn't say anything about when the construction started.

For all we know, module-fabrication was in progress for at least a few months by that point.


"...The ATVP has already begun construction of the first two units of the S5 SSBNs, which at 13,500 tons are twice the size of the Arihant-class submarines. The first S5 will enter service in the early 2030s. A total of four S5 SSBNs will be acquired by the late 2030s."
 
Of course, but L&T produces a whole lot of engineering goods at the Hazira plant in adjoining units. These pieces are likely to be submarine-related though, just can't say for sure. Wish they laid them on the side like this:

View attachment 54211



I've been seeing this image for over a decade now, originally popularized by Prasun Sengupta's blog. These are not really images of L&T facility though, neither is this boat Arihant. It's either a Russian or French boat, I remember seeing the original pic but can't find it now.

I don't think any pics of the module-construction facility's interior exist. This CAD image is probably the closest we'll get:

View attachment 54212



Yep.



Actually, the report just said the first two units of S5 had "already begun construction". The report was published in December 2025 yes, but it doesn't say anything about when the construction started.

For all we know, module-fabrication was in progress for at least a few months by that point.


"...The ATVP has already begun construction of the first two units of the S5 SSBNs, which at 13,500 tons are twice the size of the Arihant-class submarines. The first S5 will enter service in the early 2030s. A total of four S5 SSBNs will be acquired by the late 2030s."
Multiple hull rings can be spotted at hazira facility in historical imagery
hullrings.png
hullrings2.png


from 2023 - These rings start to appear from 2023, indicating fabrication of structures started years ago with completed modules being shipped now
wergv123.png
 
Last edited:
Multiple hull rings can be spotted at hazira facility in historical imagery
View attachment 54213
View attachment 54214


from 2023 - These rings start to appear from 2023, indicating fabrication of structures started years ago with completed modules being shipped now
View attachment 54215

Wanted to talk about this but forgot,

Firstly, while I have to say the disclaimer that we cannot definitively say these rings are for our next-gen N-sub programs, it's really interesting that rings of slightly varying diameters can be seen.

If you look at the way the inner pressure hull is laid out in modern Russian boats like Yasen & Borei, you'll see that the diameter varies depending on the compartment in question:

Screenshot 2026-10-28 162042.jpg

Borei-II_SchematicA.jpg

This speaks to the fact that while these newer Russian boats are nominally 'double-hulled', in a lot of sections the boat is effectively single-hulled.

It's entirely possible we might be building a similar 'hybrid hull' layout that will combine single- and double-hull sections.
 
Of course, but L&T produces a whole lot of engineering goods at the Hazira plant in adjoining units. These pieces are likely to be submarine-related though, just can't say for sure. Wish they laid them on the side like this:

View attachment 54211



I've been seeing this image for over a decade now, originally popularized by Prasun Sengupta's blog. These are not really images of L&T facility though, neither is this boat Arihant. It's either a Russian or French boat, I remember seeing the original pic but can't find it now.

I don't think any pics of the module-construction facility's interior exist. This CAD image is probably the closest we'll get:

View attachment 54212



Yep.



Actually, the report just said the first two units of S5 had "already begun construction". The report was published in December 2025 yes, but it doesn't say anything about when the construction started.

For all we know, module-fabrication was in progress for at least a few months by that point.


"...The ATVP has already begun construction of the first two units of the S5 SSBNs, which at 13,500 tons are twice the size of the Arihant-class submarines. The first S5 will enter service in the early 2030s. A total of four S5 SSBNs will be acquired by the late 2030s."
Let's just say that what we can see is only the tip of the iceberg all courtesy to the power that be. People have been making estimate of India's SSBN developments since early days of the forum and before; however all estimates have fallen quite short of actual events. I remember having groupies chat way back before lockdown, especially with our Amal Georgie how even our advance estimates had fallen short.

GOI is not obligated to report and when it does, it's safe to say they have disclosed after 2-3 have passed conservatively speaking. It's always to keep that time gap/difference in mind when we make the estimates especially on black projects like SSBNs.
 
Great find. I am reasonably confident that these are modules of the 1st S5 SSBN's hull. These modules measure from 8.5-11m in length. Assuming the S5 class is ~140-150 m in total length, we will need 14-15 such modules.

It was reported that construction of the 1st S5 sub started on December 2025. So, in ~10 months we have 4 modules ready to ship to SBC Vizag for outfitting. At this rate we should have all the modules by ~40 months (3 years, 4 months). Setting up the reactor, propulsion, sensors, VLS tubes etc. at SBC will take 1.5 years minimum. So that's 5 years in total. Then outfitting & then joining the modules. That will be about 6.5-7 years. Then 2-3 years of harbor trials & sea trials. Then another 2-3 years of weapon trials from the sub. Full service entry in late 2030s.

IN has ordered the construction of just the 2 subs for now with plans of having a fleet of 6 eventually. I hope the orders come in time. Don't want a stagnant production line like we have with the destroyers.
We shouldn't take December 2025 report as gospel truth as we all know how transparent (especially accurate) those reports are, don't we? It's safe to say the progress is much further ahead than what is being reported now considering the past reporting on SSBN fleet developments.

Again, we don't say we are right, but what's wrong in saying anything as our guess is as good as theirs and others...
 
Wanted to talk about this but forgot,

Firstly, while I have to say the disclaimer that we cannot definitively say these rings are for our next-gen N-sub programs, it's really interesting that rings of slightly varying diameters can be seen.

If you look at the way the inner pressure hull is laid out in modern Russian boats like Yasen & Borei, you'll see that the diameter varies depending on the compartment in question:

View attachment 54637

View attachment 54638

This speaks to the fact that while these newer Russian boats are nominally 'double-hulled', in a lot of sections the boat is effectively single-hulled.

It's entirely possible we might be building a similar 'hybrid hull' layout that will combine single- and double-hull sections.
Nothing wrong in saying all those submarines are double hulled as no nuclear boat is fully double hulled by that parameter however that's not the point here. There are certain machinery, for example say ballast, which are outside of inner hull however inside the outer hull, so obviously inner hull shape and diameters will vary from the outer hull, hence the perception of single/hybrid/double hull design.
 
  • Like
Reactions: Photon Vish