Ministry of Defence today inked a contract with the US Government for Tri-Service procurement of 31 MQ-9B Sky/Sea Guardian High Altitude Long Endurance (HALE) Remotely Piloted Aircraft System (RPAS). Another contract has been signed with General Atomics Global India Pvt Ltd for… pic.twitter.com/N2s2xIArvg
— Ministry of Defence, Government of India (@SpokespersonMoD) October 15, 2024
HT's Shishir Gupta reports that India's MQ-9B weapons fit wil include GBU-39B SDBs and a 'rotary canon' of unknown make. If the news about SDB is true, it could possibly make it to the LCA Mk1A, Mk2 and AMCA, maybe even the Rafale. The old Paveway LGBs are probably up for replacement anyway.
<SNIP> The acquisition of 31 Predator drones armed with Hellfire missiles, GBU-39B precision-guided bombs and high-fire rotary cannon, was once again spearheaded by the Indian Navy. <SNIP>
SIPRI shows that JDAMs are under negotiation/on order for the LCA. We really are buying an eclectic mix of munitions even as a range of indigenous ones is starting to come online!There was talk of integrating JDAMs on LCA, no clue where we are on that, but the SDB family is far more desirable.
- Deal includes $520 million performance-based logistics (PBL) and depot level MRO for 8 years or 1.5 lakh flying hours
— Strategic Frontier (@strategicfront) October 16, 2024
- General Atomics will have Global MRO facility for the system in india
- Consultancy to DRDO and other for local UAV development.
Partnerships:
— Strategic Frontier (@strategicfront) October 16, 2024
- HAL Engine Division for engine MRO
- Bharat Forge to manufacture main landing gear components and subassemblies
- Sankhya Infotech Limited for Simulation Training
- HFCL for radar subsystems
- 114ai for Multi-Domain Situational Awareness
SIPRI shows that JDAMs are under negotiation/on order for the LCA. We really are buying an eclectic mix of munitions even as a range of indigenous ones is starting to come online!
Check the recent posts in this thread.MSN
www.msn.com
Deliveries of the drones will begin in four years and will be completed within six years under a government-to-government agreement, cleared by the Prime Minister-led Cabinet Committee on Security
If the Chinese actually undertook something like that they're bigger fools than I thought they were. Who'd ever forewarn the enemy through such measures especially if you're scheduled to fight a war with them ?Internet chatter some time back indicated Chinese used EW to take control over our drones in the Eastern sector and forced some to land.
Assuming those reports were true, what could have been the cause? COTS components from China based suppliers?
What are the odds they couldn't do the same to a $30M MQ-9B?
If the Chinese actually undertook something like that they're bigger fools than I thought they were. Who'd ever forewarn the enemy through such measures especially if you're scheduled to fight a war with them ?
Internet chatter some time back indicated Chinese used EW to take control over our drones in the Eastern sector and forced some to land.
Assuming those reports were true, what could have been the cause? COTS components from China based suppliers?
What are the odds they couldn't do the same to a $30M MQ-9B?
The MQ-9B is a HALE platform whereas the Tapas BH-201 is a MALE platform.![]()
India’s MQ-9B buy from the US caps fruitless push for homemade drone
Defense leaders in News Delhi believe their drone needs are too urgent to wait for domestic developments that have yet to mature.www.defensenews.com
Delivery of MQ-9B HALE will begin in 2029:https://t.co/UJayhji248
— Adithya Krishna Menon (@AdithyaKM_) February 2, 2025
Now that's a long lead time, could be due to the reported domestic assembly & integration of 🇮🇳 equipment, such as NASM-SR
MoD should ensure timely delivery & execution of all clauses that supports aatmanirbharta.. pic.twitter.com/RBk9T2kujn