General News, Questions And Discussions - Indian Navy

In addition to submarines, Naval Group has signed MoUs with Hindustan Shipyard Limited, Visakhapatnam to support their bid for the Navy’s Landing Platform Dock (LPD) ships and with Larsen and Toubro (L&T) to support their midget submarine development.


Navantia: “This is for us only the first step in our partnership with L&T because we are also teaming with them for the offer for the LPDs (landing platform docks),” he said, referring to India’s plans to acquire the amphibious warfare vessels.

So, it seems we have two players for LHD program:

1. HSL + Naval Group
2. L&T + Navantia
 
Last edited:
  • Like
Reactions: Amarante and Sathya
By 2035, the Indian Navy will be in the Big 4. It will not only be the master of the IOR but also a true Blue Water Navy.

The Indian Navy has alot of future technologies in the pipeline:

1. CMS 24-29
2. UNICORN Integrated Mast
3. USVs
4. Mother ships
5. HALE UAVs
6. NGMMCB
7. SMART
8. LRAShM
9. MPA
10. BMD
11. SL- ICBM
12. LRSAM
 

At 23:10

Previously, the plan was to construct 6 NGD but now it has changed to 8 which will be built in 2 phase with both phases having 4 destroyers each.

Also, P-17B will also be executed with same number i.e. 7 ships.

Credits: marich01
 
  • Informative
  • Like
Reactions: Parthu and Ashwin

At 23:10

Previously, the plan was to construct 6 NGD but now it has changed to 8 which will be built in 2 phase with both phases having 4 destroyers each.

Also, P-17B will also be executed with same number i.e. 7 ships.

Credits: marich01
MDL is expecting,

7 P-17B for Rs 60,000 cr
8 NGD for Rs 80,000 cr

Repeat kalvari can be with or without API. So, no full clarity on cost. Order can be expected in 6 months.

Korea's have informed in writing that they are withdrawing from the P75I project. Thus MDL tied up with TKMS.

MDL is working with NDB for Project 76 SSK design.
 
  • Like
Reactions: Parthu and marich01
MDL is expecting,

7 P-17B for Rs 60,000 cr
8 NGD for Rs 80,000 cr

Repeat kalvari can be with or without API. So, no full clarity on cost. Order can be expected in 6 months.

Korea's have informed in writing that they are withdrawing from the P75I project. Thus MDL tied up with TKMS.

MDL is working with NDB for Project 76 SSK design.
Although its all hypothetical, my 2 cents on this:

Our sanctioned strength for destroyers is 15 and for frigates it is 24. By 2027, we will be having 10 DDG:
03 P-15
03 P-15A
04 P-15B

And 23 FFG:
03 P11356 Batch 1
03 P-16A
03 P11356 Batch 2
03 P-17
07 P-17A
04 P11356 Batch 3/4

We will be short of 5 DDG and 1 FFG to reach the sanctioned numbers.

We will be replace 03 P-16A and 03 P11356 Batch 01 frigates with 07 P-17B and reach the total number of 24 FFG by ~2035.

03 P-17
03 P11356 Batch 02
07 P-17A
04 P11356 Batch 03/04
07 P-17B

By the same time, we will also be inducting 04 NGD in first phase to reach the number 14 then we will add another 04 in second phase to replace the 03 P-15 and meet the requirement of 15 DDG by ~2037.

03 P-15A
04 P-15B
04 NGD Batch 01
04 NGD Batch 02
 
  • Like
Reactions: marich01