Why do you ask that? It specifically mentions EHWT which is a DRDO development.Are we procuring F-21 torpedos or integrating the desi one?
$100 million just to integrate is outrageous. This is what happens when you don’t have design control.
Why do you ask that? It specifically mentions EHWT which is a DRDO development.Are we procuring F-21 torpedos or integrating the desi one?
Because of that price I got confused.Why do you ask that? It specifically mentions EHWT which is a DRDO development.
$100 million just to integrate is outrageous. This is what happens when you don’t have design control.
Because of that price I got confused.
All depends what means "integrate".$100 million just to integrate is outrageous.
Matching upto basically DM2A4 and Black Shark torpedos then.HWT is 50 knot speed, did 47knot in trials with the old power supply battery. In line with @Gautam calculation above.
pic; ****
![]()
Specs look similar to EHWT. Hope someone gets a clear shot from the rear. It might have pump jet propulsion.HWT is 50 knot speed, did 47knot in trials with the old power supply battery. In line with @Gautam calculation above.
pic; ****
![]()
The image to the bottom left of the slide appears to be a Russian SET-65E. Good way to build up expertise towards cutting-edge stuff.