@kurup are any higher resolution versions of those gslv d2 launch pictures available ?
Nope , No higher resolutions pics available ....![]()
Where did you get these from?
ISRO Says Placing Heavier Satellites Aboard GSLVs Next Challenge
ISRO said it will make bigger payload compartment to accommodate still bigger spacecrafts onboard in GSLV.
All India | Press Trust of India | Updated: December 19, 2018 21:32 IST
ISRO's GSLV-F11 placed the military communication satellite GSAT-7A into its intended orbit on Wednesday![]()
ISRO's GSLV-F11 placed the military communication satellite GSAT-7A into its intended orbit on Wednesday
Sriharikota:
ISRO will undertake placing heavier satellites onboard its geosynchronous launch vehicle in future following the successful launch of an advanced communication satellite on Wednesday, Vikram Sarabhai Space Centre Director S Somanath said.
"There is always (scope of) further improvements in GSLV and in the coming GSLV-F10s and F12 missions, we are going to make bigger payload compartment to accommodate still bigger spacecrafts and that is another important challenge in front of us," he said.
He said the scientists were ready for that change and to make sure that the GSLV continues to remain very successful and "rugged" vehicle like ISRO's trusted workhorse, the PSLV (Polar Satellite Launch Vehicle).
ISRO's GSLV-F11, carrying the 2,250kg GSAT-7A, lifted off at 4.10 pm on Wednesday from the second launch pad at Sriharikota, situated about 110 km from Chennai, and placed the communication satellite into its intended orbit about 19 minutes after lift-off.
Earlier, referring to the salient features of the GSLV-F11 launch, Mr Somanath said the vehicle was an improved version where scientists brought changes in the cryogenic stage as well as second stage to improve payload capability.
"This resulted in a lot of engineering changes and new elements. The (GSLV) vehicle itself is 1.5 metres longer than the previous GSLVs and it calls for understanding aerodynamics, hardware design and control systems," he said.
He congratulated the ISRO team for "meticulously" undertaking all the new changes and making a successful launch.
"This is sixth consecutive success of the GSLV. It only shows that this vehicle is going to stay longer and to make more missions in the years to come with improved capability," he said.
ISRO Chairman K Sivan said GSLV-7A was India's heaviest satellite with indigenous cryogenic stage.
He said the second stage propellant loading of the vehicle has been increased from 37.5 tons to 40 tons while cryogenic stage propellant loading from 12 tons to 15 tons along with enhanced thrust value for cryogenic stage, he said.
"This has been successfully demonstrated in this mission and we got 2,000 km more than what we expected. This is a great achievement," he said.
Referring to how presence of cyclone Phethai in Bay of Bengal created "anxious" moments for ISRO scientists, Mr Sivan said, "This particular mission has given clearly a lot of anxiety to all of us. Because the weather god was not conducive for us (for) a week."
"Under this environment, definitely the Met team from Sriharikota rose to the occasion to take care of any eventuality and the way they gave confidence to us, clearly the launch campaign was managed nicely," he said.
Phethai lashed coastal Andhra Pradesh on Monday, triggering heavy rains, uprooting trees and electric poles, and claiming one life before moving towards Odisha.
Chandrayaan-2 on track, 32 missions next year: ISRO
ISRO Chairman K Sivan on Wednesday claimed the Chandrayaan-2 project was on track and the space agency was planning to carry out 32 missions next year.
Published: 20th December 2018 05:02 AM | Last Updated: 20th December 2018 05:02 AM
![]()
ISRO Chairman K Sivan (File | PTI)
By Express News Service
SRIHARIKOTA: ISRO Chairman K Sivan on Wednesday claimed the Chandrayaan-2 project was on track and the space agency was planning to carry out 32 missions next year.
"It will be a busy 2019 year for us. Chandrayaan-2 launch is being planned in the first quarter of 2019. The launch window is between January 3 to February end. We are striving hard for that," he said.
ISRO has managed to accomplish 17 missions this year and the next target is raised to 32 missions.
Quick read:
![]()
35 days, 3 launches:
- This is the seventh and last launch in 2018.
- GSLV-F11 is the 7th flight of GSLV Mk11.
- The satellite GSAT-7A is the 35th Indian communication satellite. It weights 2,250 kg.
- The satellite is built to provide communication capability to users in the Ku-band over the Indian region.
- Customised for military operations, GSAT-7A will improve real-time aircraft-to-aircraft communication.
- The rocket is equipped with the indigenously developed Cryogenic Upper Stage.
- This three-stage launch vehicle is 51 meters tall and has a lift-off mass of about 421 tonnes.
- GSLV-F11 incorporates some major improvements. While the High Thrust Vikas Engine in the second stage enhances the vehicle performance, induction of electro-mechanical actuation system leads to improved reliability.
- GSAT-7A is the heaviest satellite being launched by GSLV with an indigenously developed cryogenic stage.
In the last 35 days, ISRO has successfully launched three missions from SDSC, starting with GSLV MkIII-D2 on November14, PSLV-C43 on November 29, and finally GSLV-F11 on Wednesday.
Mission life: 8 years
Next @isro RLV-TD (1:5 scale) mission will involve helicopter drop followed by landing on a 2-km runway. (A 4-km runway is under construction for full scale RLV landing.) Follow-up RLV-TD mission will involve boosted orbital insertion, deorbit, and runway landing.
— Vijainder K Thakur (@vkthakur) December 20, 2018