Answer in above tweet, AK want.to see. static display atleast in 2027 Aero India.
Meaning atleast 2 yrs behind schedule.
Nobody believes HAL and ADA on any particular date on LCA MK2 ...after all these delays of HAL LCA MK1A. We will wait and watch to see when it's constructed. HAL should at least publish some images of the jigs if they have already started the assembling. I don't think we can make any predictions at this time because we don't have any HAL images of LCA MK2.Answer in above tweet, AK want.to see. static display atleast in 2027 Aero India.
Meaning atleast 2 yrs behind schedule.
Let's hope that it is not delayed any further.
Let's hope that it is not delayed any further.
Good news on Tejas mk2.
— Arihant_Ray (@Ray70409890) February 12, 2025
- Fabrication of 70 percent of all airframe assemblies have been completed.
- Rest 30 per assemblies will be built by June.
- Aircraft equipping will start in June.
- Certification of almost all Mk2 LRU have been completed.
- FF in end 25 or early 26. pic.twitter.com/ZzPYYWc2B5
Current status of Tejas Mk2
— shreedhar singh (@shreedharsingh9) February 12, 2025
➡️ Assembly of air frame has started, 70% assembly of airframe has been completed and all assembly will be completed in June
➡️ It will have its first flight in the first quarter of next year
➡️ Engine run is planned 3 months before the first flight
I will say don't expect anything unless you see the product roll out these people have 100% reputation of making things delays. Let's wait and watch; hope they prove everyone wrong, and AMCA is also getting ready in 2028.It usually takes 10-12 months from completion of fabrication to the first flight of the first prototype. Do not expect the first flight to occur this year.
Just few days back Anathakrishnan of Tarmac tweeted hoping to see atleast static display of Mk2 in next Aero india.I will say don't expect anything unless you see the product roll out these people have 100% reputation of making things delays. Let's wait and watch; hope they prove everyone wrong, and AMCA is also getting ready in 2028.![]()
There won’t be any Roll out ceremony of Tejas mk2 in order to save time.
— Arihant_Ray (@Ray70409890) February 12, 2025
FF is planned by end of 25 or in first quarter of 26.
EGR is planned to be conducted in Oct Nov of this year.
4 LRIP mk2 will be built for flight testing.
Weapons trials will happen in 26. pic.twitter.com/ohQqlRk2c2
There won’t be any Roll out ceremony of Tejas mk2 in order to save time.
— Arihant_Ray (@Ray70409890) February 12, 2025
FF is planned by end of 25 or in first quarter of 26.
EGR is planned to be conducted in Oct Nov of this year.
4 LRIP mk2 will be built for flight testing.
Weapons trials will happen in 26. pic.twitter.com/ohQqlRk2c2
Oh GOD..
There won’t be any Roll out ceremony of Tejas mk2 in order to save time.
— Arihant_Ray (@Ray70409890) February 12, 2025
FF is planned by end of 25 or in first quarter of 26.
EGR is planned to be conducted in Oct Nov of this year.
4 LRIP mk2 will be built for flight testing.
Weapons trials will happen in 26. pic.twitter.com/ohQqlRk2c2
Oh GOD..
The airframe is a modification of one that's already in production, it doesn't have to go through all the pre-flight ground testing that new designs go through.
It's bigger modification than JAS Gripen C/D to NG .. let's hope 3-4 years they ll certify atleast limited basic capabilities.
This is such a joke mk2 should have atleast have had a first flight by now. The plaaf has 600 j-10's. How are we supposed to competeInitially I thought roll out simply 1 day coconut breaking function...
On second thought, if systems are not ready, they ll have to use fillers for the roll out.. which may take time & efforts.
AK wanted to know when will public get to see the aircraft, but chief answered about induction time..