Tejas Mk2 (Medium Weight Fighter) - News and discussions

This absolutely not possible ..

That ll leave HAL to make 16 + 8 FOC Mk1 till 2026. Even at the rate of 8/ year , Hal will be idle from 2022 april.

Since HAL plans to increase production capacity.. it should be earlier than that.

The airframe of FOC and MK1A are not different, so HAL can produce the airframes even during the prototype stage. But since most of the production parts are outsourced already, it will be interesting how private companies react to delays and orders without payments. But then again, PKS conclusion's should very taken with caution.
 
  • Like
Reactions: Sathya
If MK1A can only reach units from 2025 - 6 years from now,we are totally *censored*ed.The new fighter tender is stuck and hundreds of 50 yr old migs are being retired/going down themselves.
 
Looooooooooooool 😂😂😂😂😂

If it needed more proof that you have absolutely no idea what you are talking about, this would it be. A typical mistake by some with random knowledge.

Payload only tells you, what the total weight limit of all stations is. So if every station would be loaded with the maximum possible weight for that station. That however "logically" is not the case with CAP, or CAS roles and if all stations are blocked by weapons or fuel already, you can't add more weight either!
That's why the payload increase means nothing, when you don't add also more stations, that can carry more loads.
And that's exactly why you only can spread misinformation, since you lack basic knowledge to understand first! 😁

No, genius. Payload tell you the max load you can carry. Structural MTOW will tell you the strength of the hardpoints.

6.5T is the payload the MWF can carry.
 
1556279900932.png
1556279920808.png
1556279943516.png
1556279952685.png
1556279962937.png


Graphics done by Nilesh J. Rane of BRF. It was uploaded to DDR.
 
Some Thoughts About India’s LCA Programme

India’s LCA Navy Programme
It is not widely known that the Indian Navy (IN) has not only remained a steadfast supporter of the LCA, but has also been the only agency, apart from DRDO, to make a financial commitment to the project. In the early 1990s, as the LCA programme was languishing, NHQ made enquiries about the possibility of a ship-borne version of the aircraft. On receiving a positive response, a naval version of the LCA was mooted and the LCA-Navy project, thus, came into being with a sum of Rs 4 crores being sanctioned by NHQ for a feasibility study.

This project was seen by the IN as a pioneering initiative, whose success would place India in a select list of just three countries which could produce carrier-borne aircraft. The Navy’s vision of LCA encompassed not only an acknowledgment of the talent and ingenuity of our aircraft designers and engineers, but was also meant to provide a badly-needed boost to our defence-technology base.

Here it must be pointed out that, cognizant of the possibility that this project may; (a) either not succeed or (b) fail to meet the timelines required for India’s first Indigenous Aircraft Carrier (IAC-1), NHQ recorded a conscious decision that in parallel with the LCA, it would identify an alternative aircraft for its new carriers. (As the LCA Navy programme kept slipping, this alternative turned out to be the MiG-29K; which was purchased along with Vikramaditya, but will also equip the IAC-1).

A2-AD-China1.jpg


Going back to the 1990s, a closer examination of the LCA proposal revealed some major challenges, in converting a shore-based aircraft to fly from a ship. These included lack of engine thrust, a weak undercarriage, requirement of an arrester hook, and need for fuselage re-design, before the LCA could attempt carrier operations. Undaunted, the NHQ re-affirmed its faith in the programme by writing out QRs and initiating a Navy-DRDO funded engineering development programme in 2003 with the IN contributing over Rs 400 crores (as well as engineers and test pilots) to the project. In order to facilitate testing of the LCA Navy during ski-jump launches and ‘arrested’ landings, a ‘shore-based test facility’ (SBTF) has been created in Goa, which is just one of two such worldwide.

The prototype of LCA-Navy was rolled out in July 2010, and its first flight took place in April 2012. This was followed by simulated carrier launches from the Goa SBTF; by day, in December 2014 and by night in May 2016. However, the prototype has yet to carry out trials of the arrestor hook at the Goa facility.

Sukhoi-Su-33.jpg


Possible Reasons for Navy’s ‘Rejection’ of LCA Mk 1
With the IAF having accepted the LCA into squadron service, and placing an order for 123 aircraft, the short-term future of the LCA appeared to be secure, regardless of which other machines the IAF acquires from other sources.

The LCA-Navy, on the other hand, appeared to have received a setback when, in December 2016, the IN “rejected” this aircraft for its current carriers; with the CNS reportedly saying, “We will continue to support DRDO, HAL and ADA, but the naval LCA in its present form unfortunately does not meet our qualitative requirements for carrier capability.”

MiG-29K.jpg


This peremptory rejection of the LCA-Navy by NHQ appears to have come as an unpleasant surprise to the agencies mentioned by the CNS. Their disappointment was compounded by the simultaneous issuance of a global RFI for procurement of 57 multirole fighters for its aircraft-carriers, by the navy. However, one can conjecture two valid and undeniable reasons for this, seeming ‘volte face’ by a Service, which has been a steadfast supporter of indigenization and the DRDO.

Firstly; by exercising a foreclosure option, the IN was, possibly, administering a rebuke to the DRDO for; (a) tardy progress in the LCA-Navy project (b) projecting unrealistic targets and timelines which they knew could not be met and (c) not seeking external help when they ran out of ideas. The second, and more compelling, reason could have arisen from the navy’s urgent need to formulate specifications of its second indigenous aircraft-carrier (IAC-2): given that the configuration, size and propulsion of a carrier has a direct linkage with the type of aircraft that will operate from it.

At this juncture, a brief digression is necessary, to dwell on the closely related issue of the navy’s aircraft-carrier programme(s).

The Aircraft-Carrier Conundrum
If India decides to build the IAC-2, this ship will enter service at a juncture where a balance-of-power struggle is likely to be under way in the Indo-Pacific; with China and India as major players. PLAN ships and submarines are being seen, with increasing frequency, in the Indian Ocean, and it is only a matter of time before PLAN carrier task-forces, led by the Liaoning (and her successors) make an appearance to establish China’s maritime dominance in our waters. Since the Indian response to any attempted intimidation will need to be equally robust, the decisions relating to the design and capabilities of IAC-2 assume strategic dimensions. Essentially, there are three options for selection of an aircraft for the IAC-2.

  • Conventional take-off and landing types like the US F/A-18 Super Hornet and French Rafale-M that would require a steam catapult for launch and arrester-wires for recovery. This relatively large ship would need either an oil-fired or nuclear plant for propulsion.
  • Types like the Russian Sukhoi-33 and MiG-29K would require only a ski-jump for take-off and arrester-wires for landing. This would mean a smaller ship; driven, either by gas-turbines or diesel engines. The LCA-Navy (if ready) could have been a contender in this category.
  • The F-35B, version of the US Joint Strike Fighter, capable of short/vertical take-off and landing (V/STOL), would require only a ski-jump for take-off, but no arrester wires, and this would result in the simplest and cheapest ship. (However, given the exorbitant cost and technological sophistication of the aircraft, this option could be discounted).
Once the IN has selected an aircraft, the ship’s configuration (i.e. whether it will carry a ski-jump or catapult) and its operating and maintenance facilities can be designed around it; avoiding some of the pitfalls encountered on IAC-1.

Shenyag-J-15-Flying-Shark-Taking-off-from-carrier.jpg


Implications of LCA Project
While some of the criticism levelled at the time and cost-overruns in the LCA programme and the tardy or flawed decision-making of our scientists, may be justified, we must acknowledge the huge technological achievement that this aircraft signifies for a country like India.

The sophisticated software for flight controls of this ‘unstable aircraft’, the weapon-aiming and air-data computers carried by it, and the carbon-fibre composite technology for its light-weight fuselage are the pride and joy of our scientists. Apart from this, the electro-hydraulic actuators for the controls, the pumps, motors, instruments and many of the major systems have all been developed by scientists working in dozens of DRDO laboratories and universities, and produced by MSMEs units across the country.

The beneficial fallout from the learning-process involved in evolution of the LCA and LCA-Navy has built up a strong aeronautical design, engineering, production and flight-testing capability in the country.

All this is equally true of India’s languishing Kaveri turbo-jet engine programme too which forms a vital component of India’s aeronautical aspirations. These two projects are the seeds of a promising aerospace industry, and have to be carefully nurtured by ensuring a long production-run for the LCA and its ‘evolved’ successors. The bottom-line is that if the LCA and the Kaveri engine projects do not succeed, India’s aeronautical industry faces a bleak future.

Quo Vadis LCA-Navy?
Returning to the LCA-Navy programme; reports indicate that consequent to the navy’s ‘rejection’ of this aircraft (for IAC-2), ADA and HAL have placed the project on the backburner, and further flight-testing has been stopped.

Such an approach seems to be very short-sighted because, currently, only 4 countries worldwide (USA, Russia, China & France), have the ability to design & build a carrier-borne aircraft. While the progress of the LCA-Navy, so far, constitutes a significant achievement for Indian designers, engineers and test-pilots, the programme must be taken to its logical conclusion to exploit the data and experience gained, and to justify the expense incurred.

This would require that the test programme should proceed to undertake trial landings on the Goa SBTF, to prove the hook and arrester wires, followed by actual ‘arrested landings’ on INS Vikramaditya. Once shipborne trials are completed successfully, the aircraft can be given a clearance for operations from Vikramaditya as well as IAC-1 alongside the MiG-29K.

Conclusion
Having abandoned the HF-24 Marut project prematurely, we must remember that technology does not remain static and no one can forecast the kind of developments that will take place in the next decade or two. Therefore, having come so far down the developmental path, the LCA project must not stop at 123 or even 250 aircraft, but, along with the enhanced Kaveri engine should form the core of all future fighter evolution in India.

Against this backdrop, the following suggestions need consideration during the time-frame, 2019-2030.

  • The overall role and relevance of tactical air-power at sea on a 24×7 basis, with specific reference to IAC-2 needs examination, in light of China’s comprehensive aircraft-carrier building programmes. This would help in defining the configuration of the ship.
  • The flight test programme of LCA-Navy needs to be progressed on priority. On successful completion of its trials, the aircraft should be assigned a carrier-borne operational or training role (on Vikramaditya and IAC-1) within the ambit of limitations imposed by its performance.
  • Depending on the configuration of IAC-2, a programme needs to be launched for development of a Naval Advanced Combat Aircraft (NACA), compatible with IAC-2 and successors. The data gathered during flight testing of LCA-Navy would be invaluable for this.
  • Past experience shows that user-involvement has been crucial for success in every project. Moreover, while scientists, technologists (and even bureaucrats) have a role to play in every programme, project-management is not always their strong point. This lesson needs to be applied in field of aeronautics and air force and navy officers need to be inducted into key positions in the LCA Programme.
 
An old wind tunnel model from National Aeronautic Labs(NAL). The one on the left looks like a MK2 doesn't it ? the right one looks like a Mig 27 or something.

47D98dc.jpg
 
An old wind tunnel model from National Aeronautic Labs(NAL). The one on the left looks like a MK2 doesn't it ? the right one looks like a Mig 27 or something.

View attachment 8127
the right one is a double engine plane. Mig 25 ?

The left one is a modified Tejas : air intakes are not under the apex. More like a Gripen/Tejas combo. Very interesting in fact. Cleaner design than Tejas one.
 
the right one is a double engine plane. Mig 25 ?
Nah......can't be.
Single vertical tail Mig 27
1563176601363.png


Double vertical talis Mig 25.
1563176733124.png


The left one is a modified Tejas : air intakes are not under the apex. More like a Gripen/Tejas combo. Very interesting in fact. Cleaner design than Tejas one.
Agreed.
At first sight it looked to me like a F-16 with conformal tanks. Then I noticed the canards.:p
This looks like a better design than the proposed Mk2 design. Wonder why this wasn't chosen.
 
Nah......can't be.
Single vertical tail Mig 27
View attachment 8169

Double vertical talis Mig 25.
View attachment 8170


Agreed.
At first sight it looked to me like a F-16 with conformal tanks. Then I noticed the canards.:p
This looks like a better design than the proposed Mk2 design. Wonder why this wasn't chosen.
You are right. Mig 25 is a twin fins. But the scale model is a two engines one !
 
Well I think Satheesh Reddy is being facetious about being self sufficient in 5 years. But for what its worth, this is straight from the horse's mouth :

".........The LCA (Light Combat Aircraft Tejas) from where evolution into various other projects like Mark 2 RV stealth aircraft (started)........."

So maybe all the rumors about Mk2 being stealthy aren't completely false.

India will become self-reliant in defence production in next 5 years: DRDO chief
 
An old wind tunnel model from National Aeronautic Labs(NAL). The one on the left looks like a MK2 doesn't it ? the right one looks like a Mig 27 or something.

View attachment 8127

The one on the left was designed in the 80s, a canard version of the LCA. At the time they decided it would be too complex and would have exceeded requirements, so was unnecessary.

AFAIk, the one on the right is an indigenous design meant to follow the HF-24. Not 100% sure if that was the design though.
 
  • Informative
Reactions: Gautam