ADA AMCA - Advanced Medium Combat Aircraft

  • Thread starter Thread starter Tarun
  • Start date Start date
Delhi: On the first two squadrons of Indigenous Advanced Medium Combat Aircraft to be produced together by GE and HAL, DRDO Chief Samir V Kamat says, "... For our next generation aircraft, the first two squadrons will go with the GE 414 engine... But beyond that and for developing the engine capability with 6 generation technologies, we need to develop a high thrust to weight class engine. So hundred and 10 kilonewtons is just a ballpark figure that I have given you, but we need to develop technologies which will allow us to develop a 6th generation engine. And for that, we want to work in collaboration with a foreign OEM to reduce the risks in this development... We have been talking to Safran of France, Rolls Roys of the UK and GE of the US. We will choose the partner among the 3... We hope that within the next 6 months, we are able to take a decision... (LCA Mk2 and 2 Squadrons will be powered by) GE 414 engine, which will be produced in the country. GE and HAL will enter into an agreement..."

 
  • Like
Reactions: TARGET
Does anyone knows why AMCA was sitting on drawing board from 2015 till date? Thats like 8 years! 8 years and no sanction of the project by CCS. Why so?
 
Does anyone knows why AMCA was sitting on drawing board from 2015 till date? Thats like 8 years! 8 years and no sanction of the project by CCS. Why so?
Preliminary design completed in 2021, last few years it was under detailed design phase. There is nothing bad about timelines. FCAS or GCAP is in “drawing board” for last few years targeting service entry by 2040.

MoD asked to create SPV for AMCA and IMRH.
 
Does anyone knows why AMCA was sitting on drawing board from 2015 till date? Thats like 8 years! 8 years and no sanction of the project by CCS. Why so?

After creating the paper design in 2013, PDP, they needed to validate the design, like testing the RCS. And they had to wait for LCA to achieve FOC before the DDP could begin. Now we are getting done with CDR, awaiting the engine deal, and then the engineering phase.
 
Does anyone knows why AMCA was sitting on drawing board from 2015 till date? Thats like 8 years! 8 years and no sanction of the project by CCS. Why so?
It's our first VLO fighter, what did you expect? Look at how many times the design was changed from Raptor like to F-35 like(intakes).
 
No press release so far, likely a case is presented to the Govt from DRDO-ADA side as per tweets shared by some. We have to see. The HAL outreach program with pvt industry for su30 is a more credible news today.
 
Excited Seinfeld GIF
 