I thought we had this debate earlier which should've ended when the then newly appointed ACM Bhadouriya clearly stated he looked forward to inducting more Netras till such time as the DRDO AWACS weren't available.Some wrong assumptions there.
A Netra+ cannot be designed and inducted faster than AWACS-India, since a new platform has to be chosen, modified, built, integrated and tested. It's going to take the same time.
We have plenty of AWACS in case of war, as many as 6 right now. Even the 12 P-8Is can perform the role. Aerostats are also a pretty good addition to SA.
IL-76s do not have maintenance issues, but do have spares issues. But the IAF has been doing a good job of making sure enough spares are available for the Phalcon and IL-78s.
The objections to the platform ( Embraer) are not something which prevents it from future participation should the GoI / MoD accept the case made to it by HAL / IAF.