DRDO is doing fine a very broad brush to call it a failure,given the resources its doing Ok.
Perhaps your definition of "Success" is too stretched? My definition of success is simple, If a product failed to meet its intended role, the "project" is a failure.
Arjun was supposed to replace lion share of our soviet era tanks (Some 2500 tanks). Have they managed to do that? Can they ever do that? Answer is a big "No". Roads and bridges cannot handle the tank? That is cute. When you are making a product for a client, you make it for the client not for yourself or someone else. DRDO should have made a tank for the Indian Armed forces for use in Indian theater of operation, not for Germans, Syrians or Americans. Project coordination between end user and development team was poor. As a project, it is a failure.
Kaveri was supposed to be an engine for Tejas. Does it succeeded in fulfilling its purpose? Again No. Ship has already sailed, it failed to meet its objective. As a project was a failure. But even if they can make it in 5-6 years,making the engine is still worth it. But I am afraid its gonna be under powered by the time they make it.
Project NAG is also a failure in meeting its core objective, ie, to replace the 2nd generation man portable antitank guided missiles.
Many other projects have taken off using research base of NAG project under different names. Hopefully they will be successful. But NAG project failed to meet its objective.
Saras looks more brighter than the above 3, i agree. Even if everything goes fine, it is still 7-8 years away from getting certified.For military application it might get certified earlier according to some sources. The price of the aircraft is high for a 14 seater aircraft and its its commercial viability as a civilian aircraft looks bleak. Ex HAL chief apparently believes that it is an outdated program for civilian applications. However, I am still hopeful for its military application.
I am not denying that all of this programmers contributed to advancement in research base. However, due to many reasons,Including a pathetic project management, all projects failed to meet its objective. After the failure to meet its core objective, government was forced to change the goal post for projects like Arjun for example by limited induction in desert frontier etc.
You are oversimplifying a project's success or failure based on simple outcomes.
The F-22 was expected to replace all of USAF F-15s, but that didn't happen. So would you consider the F-22 a failure?
The Arjun tank itself is a success. But what failed it was our economic conditions, the same thing that "failed" the F-22. We just built something that took more time than expected, but does what it's meant to do. It's a different story that its unit price did not meet the Army's standards and support infrastructure did not meet Arjun's standards, both can be solved by simply throwing more money at it. But the tank itself is a success. If it wasn't, the army wouldn't have gone for 240 tanks, the total order would have been zero.
The Kaveri was expected to go on LCA, but it was also expected to become a whole family of engines for different purposes. Now, it's not that the Kaveri failed per se, but it's the LCA that became overweight that led to the demise of the fighter version of the Kaveri. The engine itself has pretty much met all the parameters expected from it. But then, I wouldn't call the LCA also a failure simply because it didn't meet your unnecessarily high standards. We simply put a more powerful engine in it and it performs as expected. The Kaveri will power UAVs and frigates for now and will move on to more bigger things as time goes.
As for Nag, it was designed for tank destroyers, and not as a man portable missile. The man portable version is in testing right now. The army will start taking delivery of the NAMICA in 2019..
https://www.drdo.gov.in/drdo/pub/npc/2018/april/din-22april2018.pdf
Can you explain why intel is not able to get 10nm? Why intel is stuck at 14nm?
I know that 14nk is distance. But the way of measure may be different. Some may include only the distance between core without including gate size etc.
Intel also has 10nm.
If a company can't build something that's 10nm, then it's their problem. Like how Pakistan can't build a space shuttle.
Nope.
F-22 as a project failed in achieving its project goal due to its higher cost per unit, so US limited its production and switched to another project that they hope will achieve their objective, F-35. But, the aircraft was suitable for all USAF theater of operation and it is one generation ahead of its all other aircrafts in the World. So, they used it in limitted numbers, the constraint was unit cost, not theater of operation.
Nope, Arjun is not failed because of the same thing that "failed" F-22. Arjun is failed because it cannot operate in Indian theater of operation, not becuase of its unit cost. If Arjun could operate in all Indian theater of operations like T-72 or T90, then Army might have bought it even if costs twice per unit. But DRDO made a product that is not suitable for Indian theater of operation and proposed a ridiculous plan to overcome that f*ckup. Just rebuilt the entire theater of operation to a point where tank can work in it, lol. Thats like my plumber asking me to rebuilt my home, so that his ridiculously large piping can fit in it. He is not gonna get business, I will just call another plumber who can do the job. But if the plumber was telling me that the size of pipe is not a problem and the pipe will cost twise, I might still buy it. But rebuilding the house, No, that is not a feasible solution to the problem I have.
tank only suitable for desert terrine so army bought some to field in desert terrine. Does this tank provide any advantage for the army in terms of ingenious components and strategic autonomy? No. Tank have ridiculously large amount of imported parts and it is a logistical nightmare. Even T90 have more locally manufactured components than Arjun.
My unnecessarily high standards? I didn't put this targets sweetheart, targets were set by the institutions themselves which they failed to achieve every time. I just expected them to achieve the targets they themselves set. I am sorry that they are incompetent to achieve the project objective, I wish they had, but they didn't. I am not a fanboy to sugarcoat institutional incompetency. kavery is under powered by any definition of the word under powered and they never manged to make it a 21st century aircraft engine
The core aim of Nag project was supposed to replace 2nd generation man portable ATGMs which they failed due to overweight. Then they proposed NAMICA as a part of project since the missile is over weight by a margin of 2.5 and cannot be carried by a human. They failed in achieving its core objective of replacing some 30,000 odd 2nd generation ATGMS. Are they gonna do it? Now they started a new project under another name for man portable ATGMs, which is as always in "Testing" phase. Judging by the track record of NAG project, it is going to be in testing phase for the next decade or so.
It's actually not that simple. The Arjun was created primarily for a defensive posture in fear of the Pakistanis getting the Abrams. Once the threat was no longer relevant, the IA wanted to cancel the Arjun and start a new program. But DRDO insisted on continuing. So the tank wasn't a failure. If you present it to a country that wants an Arjun class tank, it will be competitive there.
So the tank wasn't a failure. If you present it to a country that wants an Arjun class tank, it will be competitive there.
That's fine. DRDO planned to indigenise electronics, and even the engine, once enough numbers were purchased.
The Arjun isn't a failure, the "heavy tank" concept in the Indian theatre is a failure.
Kaveri is not underpowered, the LCA is too heavy. It's now going into the IUSAV program.
Kaveri will be further developed to higher standards. If it was a failure, then the program would have been cancelled instead, like Trishul
Nag was never designed as a MPATGM. You have completely wrong information there. It was always for a tank destroyer. There is a separate project for MPATGM.
There are in fact three ATGM programs. Prospina (tank destroyer to be inducted next year), MPATGM and SANT (air launched).
The new MPATGM is in fact superior to Javelin and Spike. That's why the govt has also cancelled the Spike deal.
Kaveri not being under-powered is just your fanboy delusion. It is not only under powered, the engine is also overweight. Here is what the director of GTRE, someone who is not a fanboy accepting some realities.
"We have a functional engine, but there is a slight shortfall in performance. It has achieved dry thrust of 4,600kg and reheat thrust of 7,000kg in Bangalore, which is around 3,000ft above sea level. So, it would be around 5,000kg dry thrust and 7,500kg reheat thrust at sea level. The engine is short of thrust by 400kg and overweight by around 150kg."
Source :In aircraft engine development, you cannot set a timeline - Livemint
.
Army never WANTED or REQUESTED a tank that will match Abrams in weight (LOL) or any other form. Can you show me a single official source other than fanboy claims that say otherwise? Perhaps DRDO scientists imagined it and made one heavy tank that will not work in Indian theater of operation. Arjun was supposed to replace 2200 odd Vijayanta tanks which it failed miserably.
Here is the problem. DRDO is not supposed to build Arjun tank for any other country, it was upposed to built a tank for Indian Army for use in Indian Theater of operation, that is why the government of a third world nation spend its peoples money to built one. If they built one tank that works perfectly fine in everyother corner of the world except in Indian theater of operation,then the project is failure, they they are too incompetent and their project definition team is worthless and incompetent.
Kaveri not being under-powered is just your fanboy delusion. It is not only under powered, the engine is also overweight. Here is what the director of GTRE, someone who is not a fanboy accepting some realities.
"We have a functional engine, but there is a slight shortfall in performance. It has achieved dry thrust of 4,600kg and reheat thrust of 7,000kg in Bangalore, which is around 3,000ft above sea level. So, it would be around 5,000kg dry thrust and 7,500kg reheat thrust at sea level. The engine is short of thrust by 400kg and overweight by around 150kg."
Source :In aircraft engine development, you cannot set a timeline - Livemint
Again, since this project is ongoing, they still have the possibility of delivering something useful. I really hope that they will make an engine that is useful in 21st century, But there is still a big "if"
Army wanted NAG to replace Konkours and milan which they will not. The words like "Prospina", "MPATGM" etc started coming out almost 2 decades after NAG project started, after many timelines missed and original design become absolute before even seeing the light. Its just a rebranding to get the project out of IGMDP after its failure to meet all deadlines. If they suceed in building them within reasonable timeline, it is worth it. Otherwise, it is just an addition of another story of DRDO failure to meet the nation's demand and expectation.
This is 2008 information! There have been more development after that. The same person Mohana Rao had been shouting in 2009 that UPA was not providing high altitude test bed for kaveri despite repeated requests. But that has been resolved now and has been cleared by Safran So, taking ancient articles is not correct way of argument"We have a functional engine, but there is a slight shortfall in performance. It has achieved dry thrust of 4,600kg and reheat thrust of 7,000kg in Bangalore, which is around 3,000ft above sea level. So, it would be around 5,000kg dry thrust and 7,500kg reheat thrust at sea level. The engine is short of thrust by 400kg and overweight by around 150kg."
NAG was delayed deliberately by UPA after successful tests in 2010 but nevertheless it is now complete and there is initial order. Also, the ATGM generation has been saturated. Hence even if a 3rd generation ATGM is made in 2030, it will be the highest end technology. The sudden improvement recently was caused by miniaturisation of semiconductors and improvement in semiconductors. But this seems to have reached saturation limits. There will be no more further development of ATGMs unless a new breakthrough in technology happens. The words like "Prospina", "MPATGM" etc started coming out almost 2 decades after NAG project started, after many timelines missed and original design become absolute before even seeing the light. Its just a rebranding to get the project out of IGMDP after its failure to meet all deadlines. If they suceed in building them within reasonable timeline, it is worth it. Otherwise, it is just an addition of another story of DRDO failure to meet the nation's demand and expectation.
The army changed GSQR whimsically Also, in prototypes off the shelf parts are high as they are easily available and do not need setting up of manufacturing plants for new parts which are under trials. Only when trials are completed, the parts are indigenised. Calling the Arjun as mostly imported based on prototype import content is not meaningful. India has all the technology needed to make Arjun tank and will make it fully inhouse after the design is finalised.That is fine for you, but the customer Army didn't think so. The entire strategic objective of indigenous tank program was to make sure that India is not dependent on imported stuff. Funny enough, 60% of the entire componets of arjun mk1 during its induction was imported, far higher than locally manufactured Russian Tanks.
NAG was delayed deliberately by UPA after successful tests in 2010
Yes, except for 1-2 year delay by Army changing its launch platform, it was not delayed muchThere was no deliberate delay. There were technical issues on the platform that needed to be cleared.
I am basing my definition of success or failure based on whether it succeeded in doing its intended role. That is how any project manager will decide whether a project is a success or not. Outcome is the single most important part of a project, not the start, not the struggle.
F-22 as a project failed in achieving its project goal due to its higher cost per unit, so US limited its production and switched to another project that they hope will achieve their objective, F-35. But, the aircraft was suitable for all USAF theater of operation and it is one generation ahead of its all other aircrafts in the World. So, they used it in limitted numbers, the constraint was unit cost, not theater of operation.
Nope, Arjun is not failed because of the same thing that "failed" F-22. Arjun is failed because it cannot operate in Indian theater of operation, not becuase of its unit cost. If Arjun could operate in all Indian theater of operations like T-72 or T90, then Army might have bought it even if costs twice per unit. But DRDO made a product that is not suitable for Indian theater of operation and proposed a ridiculous plan to overcome that f*ckup. Just rebuilt the entire theater of operation to a point where tank can work in it, lol. Thats like my plumber asking me to rebuilt my home, so that his ridiculously large piping can fit in it. He is not gonna get business, I will just call another plumber who can do the job. But if the plumber was telling me that the size of pipe is not a problem and the pipe will cost twise, I might still buy it. But rebuilding the house, No, that is not a feasible solution to the problem I have.
tank only suitable for desert terrine so army bought some to field in desert terrine. Does this tank provide any advantage for the army in terms of ingenious components and strategic autonomy? No. Tank have ridiculously large amount of imported parts and it is a logistical nightmare. Even T90 have more locally manufactured components than Arjun.
My unnecessarily high standards? I didn't put this targets sweetheart, targets were set by the institutions themselves which they failed to achieve every time. I just expected them to achieve the targets they themselves set. I am sorry that they are incompetent to achieve the project objective, I wish they had, but they didn't. I am not a fanboy to sugarcoat institutional incompetency. kavery is under powered by any definition of the word under powered and they never manged to make it a 21st century aircraft engine
The core aim of Nag project was supposed to replace 2nd generation man portable ATGMs which they failed due to overweight. Then they proposed NAMICA as a part of project since the missile is over weight by a margin of 2.5 and cannot be carried by a human. They failed in achieving its core objective of replacing some 30,000 odd 2nd generation ATGMS. Are they gonna do it? Now they started a new project under another name for man portable ATGMs, which is as always in "Testing" phase. Judging by the track record of NAG project, it is going to be in testing phase for the next decade or so.
NopeDunno. I'm guessing a prototype canisterised Agni V. Or even Agni VI.
The length of the tube is not more than 25 feet. It can be roughly estimated by comparing the diameter of tyres to tube length.
The length of the tube is not more than 25 feet. It can be roughly estimated by comparing the diameter of tyres to tube length.
The missile inside is likely 20feet. It is highly unlikely that any Agni missile, even Agni-1 can fit in