It's actually not that simple. The Arjun was created primarily for a defensive posture in fear of the Pakistanis getting the Abrams. Once the threat was no longer relevant, the IA wanted to cancel the Arjun and start a new program. But DRDO insisted on continuing. So the tank wasn't a failure. If you present it to a country that wants an Arjun class tank, it will be competitive there.
Army never WANTED or REQUESTED a tank that will match Abrams in weight (LOL) or any other form. Can you show me a single official source other than fanboy claims that say otherwise? Perhaps DRDO scientists imagined it and made one heavy tank that will not work in Indian theater of operation. Arjun was supposed to replace 2200 odd
Vijayanta tanks which it failed miserably.
So the tank wasn't a failure. If you present it to a country that wants an Arjun class tank, it will be competitive there.
Here is the problem. DRDO is not supposed to build Arjun tank for any other country, it was upposed to built a tank for Indian Army for use in Indian Theater of operation, that is why the government of a third world nation spend its peoples money to built one. If they built one tank that works perfectly fine in everyother corner of the world except in Indian theater of operation,then the project is failure, they they are too incompetent and their project definition team is worthless and incompetent.
Brodly speaking, a project has two steps. a)Project definition steps b) Project realization step
So in essence,
step a, project definition == One big failure. They conceptualize a product that didn't fit its intended customers theater of operation.
Step b, project realization == Partial failure. Failure to build the product in intended timeline.
And again, why did the project definition phase ended up in one big failure? Because of Project Manager's failure to include customer Army in project definition phase. You build something that your customer want, not something that is not useful for your customer.
That's fine. DRDO planned to indigenise electronics, and even the engine, once enough numbers were purchased.
The Arjun isn't a failure, the "heavy tank" concept in the Indian theatre is a failure.
That is fine for you, but the customer Army didn't think so. The entire strategic objective of indigenous tank program was to make sure that India is not dependent on imported stuff. Funny enough, 60% of the entire componets of arjun mk1 during its induction was imported, far higher than locally manufactured Russian Tanks. Supply chain extents many countries around the glob making it a nightmare for Army and it ended up with far more tanks grounted than Russian tanks.
Kaveri is not underpowered, the LCA is too heavy. It's now going into the IUSAV program.
Kaveri will be further developed to higher standards. If it was a failure, then the program would have been cancelled instead, like Trishul
Kaveri not being under-powered is just your fanboy delusion. It is not only under powered, the engine is also overweight. Here is what the director of GTRE, someone who is not a fanboy accepting some realities.
"We have a functional engine, but there is a slight
shortfall in performance. It has achieved dry thrust of 4,600kg and reheat thrust of 7,000kg in Bangalore, which is around 3,000ft above sea level. So, it would be around 5,000kg dry thrust and 7,500kg reheat thrust at sea level.
The engine is short of thrust by 400kg and overweight by around 150kg."
Source :
In aircraft engine development, you cannot set a timeline - Livemint
Again, since this project is ongoing, they still have the possibility of delivering something useful. I really hope that they will make an engine that is useful in 21st century, But there is still a big "if"
Nag was never designed as a MPATGM. You have completely wrong information there. It was always for a tank destroyer. There is a separate project for MPATGM.
There are in fact three ATGM programs. Prospina (tank destroyer to be inducted next year), MPATGM and SANT (air launched).
The new MPATGM is in fact superior to Javelin and Spike. That's why the govt has also cancelled the Spike deal.
Army wanted NAG to replace Konkours and milan which they will not. The words like "Prospina", "MPATGM" etc started coming out almost 2 decades after NAG project started, after many timelines missed and original design become absolute before even seeing the light. Its just a rebranding to get the project out of IGMDP after its failure to meet all deadlines. If they suceed in building them within reasonable timeline, it is worth it. Otherwise, it is just an addition of another story of DRDO failure to meet the nation's demand and expectation.