Yeah, IN seems to call the SSN program as Project-77 and it was reduced to 3 subs and even they are awaiting the CCS clearance.
Yeah, IN seems to call the SSN program as Project-77 and it was reduced to 3 subs and even they are awaiting the CCS clearance.
It is awaiting clearance since 2019 lol such a pathetic state, even strategic programs are now also not getting funded. Only god can save us .Yeah, IN seems to call the SSN program as Project-77 and it was reduced to 3 subs and even they are awaiting the CCS clearance.
Without having done enough background work is there is any reason to clear it? Who was/is willing to do tech share for this? We are not even aware of multiple reasons behind that are crucial for this well guarded much needed yet unobtainable project.It is awaiting clearance since 2019 lol such a pathetic state, even strategic programs are now also not getting funded. Only god can save us .
If we can’t add another line after 2030 ( with 7+ trillion economy), it would be a shame !!It's impossible to deliver nuclear subs every year from just 1 line. There will be a gap of 2-3 years between each sub. Even the US has a 2-year gap from each line. I'm expecting 3 subs between 2035 and 2040 and 3 more between 2040 and 2045. In the meantime, we could expand the line for more subs, but it's not gonna change anything for the first 6.
With 3 Chakras, one every five years, we will have a Russian SSN until the last of the 6 are delivered. Hopefully the last one is a Yasen (2036), with preferably a 15-year option, extendable to 25, its full life. And it doesn't have to be the last one either.
If we can’t add another line after 2030 ( with 7+ trillion economy), it would be a shame !!
Bruh...even 3 subs did not get approval last 4 years. Now you want parallel lines? Will it happen in our life time?Sure. Expanding the line can be done later on, my post addresses that. But the plan for the first 6 will not change. We can even build 3 more in parallel in a second line if that's what they decide, so we can have 3 more between 2040-45.
AUKUS can open up Russian subs for import though.
SSN project is under Navy own budget, ie the ones we do not hear anything about are the strategic ones that PMO controls. I expect something in the lines with the french being done. Some small projects like periscope etc are coming up, SLCM likely getting some concrete form by 2028-30 maybe, torpedo tech maturing quickly. Who knows how the reactor is coming & if major help from Rus coming after aukus deal or not. Pumpjet tech also need to mature well.
Bruh...even 3 subs did not get approval last 4 years. Now you want parallel lines? Will it happen in our life time?
Are they more expensive than the billions of USD we are going to forfeit this year? If not, then that can’t be a reasonable excuse!! IMHO, it’s shear inefficiency.It's a product of finances. SSNs are really, really expensive. The unit cost is merely the start, so even getting 3 SSNs is a very big deal with our current economic standards. A large chunk of the money goes into buying raw materials very early on during the construction phase, the later phases of the construction are more difficult but cheaper, because it mainly involves assembly and integration.
When our economy doubles, we can afford twice as much as we can today.
PKS ji has also said that there doesn't exist any submarine by the designation S-4*. Only 3 are there under the ATV project and the first two S-2 and S-3 are mainly SSGN but not SSBN and only the last sub S-4 has somewhat of SSBN capability.Yes , it does come under the IN & what you say is quite possible . Wikipedia not the best or even most reliable of sources has this to report .
Project 77-class submarine - Wikipedia
en.wikipedia.org
Then there's PKS
India's Project 78A SSN Construction Programme Being Accelerated With French Partnership & Mentoring
Official Statement: France’s President Emmanuel Macron dialled India’s PM Narendra Modi on September 21, 2021 to talk about strengthening c...trishul-trident.blogspot.com
Owing to the lack of literature in the public domain on such sensitive issues , I find PKS's observations & predictions on our SSBN & SSN program quite informative & useful .
For eg he called out the fact that we haven't tested our BMs from the submarines but from submerged pontoons many yrs ago & stubbornly persisted with his stand in the face of much opposition on his blog from other commentators till he was vindicated when news came out late last yr that we'd tested the K4(?) from INS Arihant .
I like such story tellers & his track record in divulging such information which's hard to come by any other sources plus his predictive abilities has been quite good & consistent over the yrs .
We can't say anything for sure. Someone said 3 were approved long back. Now someone is saying that approval has been pending for so long.Are they more expensive than the billions of USD we are going to forfeit this year? If not, then that can’t be a reasonable excuse!! IMHO, it’s shear inefficiency.
But then how does he explain the recent test launch of the K4 from INS Arihant ?PKS ji has also said that there doesn't exist any submarine by the designation S-4*. Only 3 are there under the ATV project and the first two S-2 and S-3 are mainly SSGN but not SSBN and only the last sub S-4 has somewhat of SSBN capability.
Sir ji, I believe it take us around 9-11 years to build a SSBN. We have 2 active SSBN and we will have 2 more by 2026. IMHO we will see the S-5 class coming to life by 2035+ around the same time we will also have the SSN. 3 next generation SSBN and 3 SSN by 2040.I personally have it from a reliable source that once the S-5 series is commissioned , post MLU & refit , Arihant would function as a trainer & Arighat would be converted into an SSGN . The IN is in very preliminary stages of conducting studies for a new class of SSGNs & spy subs like the Seawolf which would follow the construction of the S-5 series in the next decade .
Yes & your point is.... ?Sir ji, I believe it take us around 9-11 years to build a SSBN. We have 2 active SSBN and we will have 2 more by 2026. IMHO we will see the S-5 class coming to life by 2035+ around the same time we will also have the SSN. 3 next generation SSBN and 3 SSN by 2040.
Are they more expensive than the billions of USD we are going to forfeit this year? If not, then that can’t be a reasonable excuse!! IMHO, it’s shear inefficiency.