https://www.google.com/url?sa=t&sou...FjARegQIAxAB&usg=AOvVaw2hOthZmhOdISICUb8AhqaF
What can this says ???
It can be official source or not
What can this says ???
It can be official source or not
https://www.google.com/url?sa=t&sou...FjARegQIAxAB&usg=AOvVaw2hOthZmhOdISICUb8AhqaF
What can this says ???
It can be official source or not
External fuel tank of #Tejas falls down in Irugur village near Coimbatore.
External fuel tank of #Tejas falls down in Irugur village near Coimbatore.
Normally these tanks are jettisoned in case of engine failure or assymetry due to one side tank not emptying out. In case of planned jettison you do it over a designated area. but in case of emergency, you have to do it ASAP.I don't understand why they call it 'fall'. It's a f***ing 'drop tank'. It's supposed to be 'dropped'.The question is not that it was dropped but why was it dropped in a field instead of the designated unihabited areas.
Reporting is just pathetic.
what the *censored*???!!! The level of reporting...
He isn't a reporter. Enthusiast you can say. A senior member of Other Forum., goes by the account name Bengalrider or something.what the *censored*???!!! The level of reporting...
gen LCA... Can these presstitutes *censored*ing get worse???
Jo bhi hum thik karte hai, "Israel is worhing with us"
*censored* these *censored*s
wait is this authenticHe isn't a reporter. Enthusiast you can say. A senior member of Other Forum., goes by the account name Bengalrider or something.
Tender is out for LCA mk1A with delivery to start from 2022. By then all 40 LCA mk1 will be delivered.
Tender is out for LCA mk1A with delivery to start from 2022. By then all 40 LCA mk1 will be delivered.
Kaveri engine is now gone underground like black project. Work is definitely going on with some critical breakthroughs but everyone is tight lipped. A few breakthroughs could be due to tech transfer for Rafale deal but not coming out. If more Rafales are signed or emerge as winner for mmrca2 then Kaveri engine is just around the corner. What surprise me is we still have not signed for GE F-404 for Mk1s with 16 SPs out and 8 in pipeline we may have already finished our inventory, as, if I am not wrong we just 24 F404 engines. How and what engine will go into the remaining 16 is interesting to see.
HAL issued a tender on 24th April 2019 with a due date of 8th June 2019. The tender was for a Retractable Mid-Air Refueling Probe to be used on project LCA(no mention of which LCA : MK1, MK1A or MK2). I've attached the RFI document. So which Tejas ? MK1A most probably.
https://hal-india.co.in/Tender_Details.aspx?Mkey=&lKey=&Ckey=MjA4ODA=&Divkey=MTY=
In the meantime some tenders of LCA Mk1A are out. Attached with post.
One document is related to timeline. This tender is for 8 jets. Also HAL is asking for serial production in 2022. Asking production rate is 16 per year. So we can assume that hal will produce 16 mk1a from 2022.
The RFI mentioned 40 units needed. Although it seems the document has been moved elsewhere. Let me see if I can find it again.Only RFI?
No mention of number of units required..
The HAL Supersonic trainer aircraft(SPORT) would be the first to feature a large smart display with all necessary data presented in a split screen manner, of course the Mk2 will have it. The Mk1 probably won't have it because of time constraints, I would love to be proven wrong though.Same size 5 inch display but smart display.
Why aren't we going for large single display screen...
Means the FoC 16 SP will be built for at least another 2 years at rate of 8 / year

@randomradio @lcafanboy