Shivalik-class & Nilgiri-class (Project 17 A/B) Frigates : Discussions

Interesting & very worrying.......something need to be done about this

View attachment 30166
Nothing much we can do. In the long run, introduce PLI like scheme for civilian shipbuilding and cultivate a champion. The issue is not with naval shipbuilding but the lack of scale advantage from the civil shipbuilding.

This graphic is wrong, guy who made it deleted it. 54B is yet to start fitting out.
 
  • Agree
Reactions: Rajput Lion
Nothing much we can do. In the long run, introduce PLI like scheme for civilian shipbuilding and cultivate a champion. The issue is not with naval shipbuilding but the lack of scale advantage from the civil shipbuilding.

This graphic is wrong, guy who made it deleted it. 54B is yet to start fitting out.
Applicable to evey sector, not just ship building. If you want to develop your military engineering, develop ypur domestic civil engineering sector. Here we import even compressor refrigerator and expect military to induct only indigenous products.
 
Nothing much we can do. In the long run, introduce PLI like scheme for civilian shipbuilding and cultivate a champion. The issue is not with naval shipbuilding but the lack of scale advantage from the civil shipbuilding.

This graphic is wrong, guy who made it deleted it. 54B is yet to start fitting out.
Looks like Wumao number fudging. IN is not this slow and PLAN is not this much faster than the rest of the world. Let's not get started on civilian shipbuilding sector because currently, that's a pretty big embarrassment for India.
 

Looks like P-16A frigates will serve beyond 2035 may be upto 2040s.
 
  • Like
Reactions: Parthu and Ashwin

Looks like P-16A frigates will serve beyond 2035 may be upto 2040s.
@Parthu told you.

told you so agree GIF by Bounce
 
  • Like
Reactions: Parthu
Its due date in one indi list/import ban list is around 2029-30 so plenty of time. Make 2 so whoever comes forward will need to work on other similar systems first. Hopefully Solar can do with their proposed 250km variant tweaked a bit , possibly need to make new launcher system as well.