Wasn't there a recent RFI for this kind of system?Did not it get tested recently few months ago?
Nah the rbs-7ng has a range of 9km but is laser guided and the latest mistral is infrared homing with a range of 8km. The drdo vshorad is in the same class as stingers and igla. Even the polish piorun and Turkish equivalent vshorad have higher ranges than drdo vshorad.Thales ones is heavier. So is the SAAB one. They will need to be tripod mounted.
VSHORADS of DRDO should beat them all in performance easily. But cost will be an issue.
Shoulder launched are pretty much only 2 things. Either a Stinger or the Igla/Verba or the DRDO MPDMS if they complete it on time.
But let's see how things turn out.
yeah probably but that is likely BDL LBRM orderWasn't there a recent RFI for this kind of system?
Don't bother with the range, they state 15% less every time and what is quoted is the min range asked in the PSQR , like the radars there is always ≥ involved which is not shown later.Nah the rbs-7ng has a range of 9km but is laser guided and the latest mistral is infrared homing with a range of 8km. The drdo vshorad is in the same class as stingers and igla. Even the polish piorun and Turkish equivalent vshorad have higher ranges than drdo vshorad.
What happened to the plan of modifying it to make it shoulder fired?
For shoulder fired needs it's gonna be Indian assembled Igla S untill DRDO gets MPDMS workingWhat happened to the plan of modifying it to make it shoulder fired?
Well see above in earlier posts on this thread page, the tenders of man portable launchers and vehicle mounted launchers were in March April, so work is on. What they are trialling now is establishing the baseline tech, a functional vshorads that you fire from makeshift launcher proto unit and it strikes the targets as per PSQR. Once this is established, improvement and ruggedization will follow, ie better technical parameters all round, variety as man portable launcher and vehicle mounted remote launcher etc.What happened to the plan of modifying it to make it shoulder fired?
The MD 360 one is likely the one refers to that is in development, MPDMS. This is from the April tender cc @FatalisFor shoulder fired needs it's gonna be Indian assembled Igla S untill DRDO gets MPDMS working