If so, they what according to you, may be a possible timeline for RFP of MMRCA and negotiation and signing period , also for P75I.
I will just bookmark it, and if you turn out right, then you can say "I said so" or the other way round.
P-75I, if we have two OEMs, assuming a tender start in Aug 2023, then we could see a winner chosen between end-2024 and mid-2025. Contract signature has too many variables to guess, it could take 6 months or 2 years. We love to haggle. I'd say the contract will be signed anytime in 2026. Dunno what's the plan if only the Koreans participate.
MRFA, assuming RFP start in June 2023, we will see flight trials after elections, completing by end 2024. Then a shortlist within 6-9 months followed by a winner by mid-2026. If Rafale wins, a signature will be done within 6-12 months, well before mid-2027. A non-Rafale jet could take up to 2 years, so anytime in 2028 or even 2029. A more optimistic date for a Rafale victory should give us a signature in the second half of 2026.
Basically, tender start to negotiations is 1.5 years for P-75I and 3 years for MRFA.
The difference between last time, when Scorpene and Rafale were chosen, and this time is, both services know exactly what they want. With the IN having already decided on what they want from their SSN and the IAF having done the same with MKI MLU and AMCA, both know what holes need to be plugged. So they won't waste time discussing and debating like they did earlier. MRFA in particular will see less wastage of time from the OEM's side, unlike what happened with MMRCA. As for P-75I, had at least 2 OEMs been prepared, we would have seen a winner being selected right now, alongside MRCBF. Both were supposed to be signed this year.