Shivalik Class (Project 17 A/B) & Talwar Class Frigates


Looks like P-16A frigates will serve beyond 2035 may be upto 2040s.
 
  • Like
Reactions: Parthu and Ashwin

Looks like P-16A frigates will serve beyond 2035 may be upto 2040s.
@Parthu told you.

told you so agree GIF by Bounce
 
  • Like
Reactions: Parthu
Its due date in one indi list/import ban list is around 2029-30 so plenty of time. Make 2 so whoever comes forward will need to work on other similar systems first. Hopefully Solar can do with their proposed 250km variant tweaked a bit , possibly need to make new launcher system as well.
 

Both Russian build Talwar will be delivered in a year.
 
Niligiri class frigates at MDL. All sat pics are from Feb 2024.

1st ship of the class, INS Nilgiri. Both the MF-STAR & the LTR-25 "Lanza" radars have been installed. Work on exhaust stack is almost complete. No main gun yet, work on Barak-8 & Brahmos VLS has begun. The RBU-6000 launchers are being installed. Delivery of this ship is scheduled for mid-2024, it will probably get delayed to late 2024.
Screenshot (971).png


This is probably INS Udaygiri. Work on radar masts, helicopter hangar & exhaust stack is complete. RBU-6000 launchers have been installed. Work on VLS is ongoing. No radars & other electronics visible. Delivery is scheduled for 2025.
Screenshot (974).png


This one is probably INS Taragiri. Both radar masts in place. Exhaust stack in nearly complete. Work on Helo hangar & VLS is ongoing. Delivery expected in 2026.
Screenshot (973).png


INS Mahendragiri seen here parked alongside INS Surat, a P-15B class destroyer. Helo hangar, exhaust stack & secondary radar mount are complete. Main radar mast is missing. Work on bridge is also incomplete. Brahmos VLS clearly visible. Delivery in 2027.
Screenshot (972).png
 
The undying love of IN for the RBU-6000 and AK-630M.
Well it is a fav as all the tech bases, repairing knowledge etc exist well with the IN. Plus, ARDE is just gathering the manpower for the ER-ASR trials. Not so much as gathering, more like extension of contract. Anyway, several rounds of trials are to happen over next 12-24 months time. So sticking with the RBU is no brainer.
 