Tejas Mk2 (Medium Weight Fighter) - News and discussions

Wind tunnel models of Mk2 :

1574245388035.png


1574245475437.png
 
  • Like
Reactions: kurup and m_itsme
It was : limited air flow versus the target, and limited AoA (vs the target) to avoid flow disturbances.

Maybe they made some improvements...

This was a problem more than a decade ago. Because of the inlet design there was fear that the aircraft cannot reach targeted AoA of 24 deg, but it's not a problem anymore and the jet has achieved 28 deg.
 
  • Agree
Reactions: vingensys
Metal-cutting for single-engine Tejas fighter planes to begin in February

The Tejas (Mk-II) are slated to replace the existing French-made Mirage -2000 and Russian -made MiG-29 class of fighters.

Dec 09, 2019 00:49 IST
By Sudhi Ranjan Sen
aircraft-station-outskirts-indian-performs-celebrations-combat_dbadbdc8-19e5-11ea-8601-f2d8bfbcf79c.jpg

An Indian Air Force (IAF) light combat aircraft "Tejas" performs during the Indian Air Force Day celebrations at the Hindon Air Force Station on the outskirts of New Delhi. (REUTERS)

Metal cutting, the first step in the start of commercial production, of the of indigenously made single-engine fighter plane Tejas (Mk-II) is scheduled for February 2020, according to Dr Girsh S Deodhare, director of the Aeronautical Development Agency (ADA) and head of the Tejas programme.

The Mk-II will have more advanced sensors including a powerful radar, empowering the fighter for operations beyond the visual range, and improved avionics. The fighter will be able to fly with more weapons and fuel than its predecessors Mk-1 and Mk-1A.

The IAF is buying 123 Mk-1 and Mk-II fighters. The Tejas Mk-II will be several tons heavier and is designed to fit into the medium weight categories of fighters.

Recently the IAF told the government that it is ready to buy more indigenous fighters to replace its aging fighter fleet.

The Tejas (Mk-II) are slated to replace the existing French-made Mirage -2000 and Russian -made MiG-29 class of fighters.

“The detailed designing stage is over; drawings are frozen,” Dr Deodhare said.

Both the Indian Air Force (IAF) and the Defence Research and Development Organisation (DRDO) are looking at the Tejas as a replacement for the the French-made Mirage-2000 class of fighters, around a dozen of which were pressed into action on February 26 to bomb a Jaish-e-Mohammed terrorist camp in Balakot, Pakistan, in reprisal for the February 14 terrorist attack in Pulwama that killed 40 Central Reserve Police Force (CRPF) troopers.

The prototype of the Tejas (Mk-II) is expected to be flying in about two years. The metal cutting will take about a year to 18 months. Tejas Mk -II, which will be fitted with a GE-414 engine, is scheduled to make its first flight in 2024. .

The DRDO has been criticized and even ridiculed for slow progress made in key military programmes, especially the Tejas light combat aircraft (LCA) programme, which has taken about a decade-and-a-half to mature. Nonetheless, the Tejas has the unique distinction of not being involved in a single crash or accident till date despite hundreds of hours of flying.

Using learnings from the past and in an effort to shorten the manufacturing and maintenance process, the DRDO has decided to build the Tejas (Mk-II) in a modular fashion and plans to lean on the private sector more than it did in the past.

Modular construction, where components like the fuselage, wings and landing gear area built separately but are put together in the final assembly line, increases the speed of construction and shortens delivery time. Modular construction requires detail exacting design of each component and allows more than on unit to be involved in the production process. It also helps maintenance and reduces time between sorties. Components can be changed easily by replacing a module making the fighter easily serviceable. A major complaint against the initial batch of Tejas fighters was that they weren’t designed in a modular fashion increasing maintenance and turn-around time.

Interestingly, the DRDO is also working on an “optimally manned” cockpit technology for the LCA and the next-generation Advanced Medium Combat Aircraft (AMCA).

The cockpit technology will help regain control of the aircraft in case the pilot loses consciousness or is incapacitated. A helmet-mounted sensor will alert ground control, which will be able to take over the aircraft’s controls to safely land the aircraft. “It is an artificial intelligence-based application. Till now we were following (the west), now we want to take the lead, “ Dr Deodhare said.


“Metal Cutting of the Tejas (Mk-II) is a very important development. The ADA and DRDO must ensure that going forward they should hand-hold private sector. Also I must underline that both the air force and DRDO must sort out power and thrust requirements or in short what kind if engine is being used from the very beginning. On the whole it is very positive and crucial development for the fighter programme,” Air Marshal S J Nanodkar said when asked about the metal-cutting for the Tejas (Mk-II).

Metal-cutting for single-engine Tejas fighter planes to begin in February
 
Metal-cutting for single-engine Tejas fighter planes to begin in February

The Tejas (Mk-II) are slated to replace the existing French-made Mirage -2000 and Russian -made MiG-29 class of fighters.

Dec 09, 2019 00:49 IST
By Sudhi Ranjan Sen
aircraft-station-outskirts-indian-performs-celebrations-combat_dbadbdc8-19e5-11ea-8601-f2d8bfbcf79c.jpg

An Indian Air Force (IAF) light combat aircraft "Tejas" performs during the Indian Air Force Day celebrations at the Hindon Air Force Station on the outskirts of New Delhi. (REUTERS)

Metal cutting, the first step in the start of commercial production, of the of indigenously made single-engine fighter plane Tejas (Mk-II) is scheduled for February 2020, according to Dr Girsh S Deodhare, director of the Aeronautical Development Agency (ADA) and head of the Tejas programme.

The Mk-II will have more advanced sensors including a powerful radar, empowering the fighter for operations beyond the visual range, and improved avionics. The fighter will be able to fly with more weapons and fuel than its predecessors Mk-1 and Mk-1A.

The IAF is buying 123 Mk-1 and Mk-II fighters. The Tejas Mk-II will be several tons heavier and is designed to fit into the medium weight categories of fighters.

Recently the IAF told the government that it is ready to buy more indigenous fighters to replace its aging fighter fleet.

The Tejas (Mk-II) are slated to replace the existing French-made Mirage -2000 and Russian -made MiG-29 class of fighters.

“The detailed designing stage is over; drawings are frozen,” Dr Deodhare said.

Both the Indian Air Force (IAF) and the Defence Research and Development Organisation (DRDO) are looking at the Tejas as a replacement for the the French-made Mirage-2000 class of fighters, around a dozen of which were pressed into action on February 26 to bomb a Jaish-e-Mohammed terrorist camp in Balakot, Pakistan, in reprisal for the February 14 terrorist attack in Pulwama that killed 40 Central Reserve Police Force (CRPF) troopers.

The prototype of the Tejas (Mk-II) is expected to be flying in about two years. The metal cutting will take about a year to 18 months. Tejas Mk -II, which will be fitted with a GE-414 engine, is scheduled to make its first flight in 2024. .

The DRDO has been criticized and even ridiculed for slow progress made in key military programmes, especially the Tejas light combat aircraft (LCA) programme, which has taken about a decade-and-a-half to mature. Nonetheless, the Tejas has the unique distinction of not being involved in a single crash or accident till date despite hundreds of hours of flying.

Using learnings from the past and in an effort to shorten the manufacturing and maintenance process, the DRDO has decided to build the Tejas (Mk-II) in a modular fashion and plans to lean on the private sector more than it did in the past.

Modular construction, where components like the fuselage, wings and landing gear area built separately but are put together in the final assembly line, increases the speed of construction and shortens delivery time. Modular construction requires detail exacting design of each component and allows more than on unit to be involved in the production process. It also helps maintenance and reduces time between sorties. Components can be changed easily by replacing a module making the fighter easily serviceable. A major complaint against the initial batch of Tejas fighters was that they weren’t designed in a modular fashion increasing maintenance and turn-around time.

Interestingly, the DRDO is also working on an “optimally manned” cockpit technology for the LCA and the next-generation Advanced Medium Combat Aircraft (AMCA).

The cockpit technology will help regain control of the aircraft in case the pilot loses consciousness or is incapacitated. A helmet-mounted sensor will alert ground control, which will be able to take over the aircraft’s controls to safely land the aircraft. “It is an artificial intelligence-based application. Till now we were following (the west), now we want to take the lead, “ Dr Deodhare said.

“Metal Cutting of the Tejas (Mk-II) is a very important development. The ADA and DRDO must ensure that going forward they should hand-hold private sector. Also I must underline that both the air force and DRDO must sort out power and thrust requirements or in short what kind if engine is being used from the very beginning. On the whole it is very positive and crucial development for the fighter programme,” Air Marshal S J Nanodkar said when asked about the metal-cutting for the Tejas (Mk-II).

Metal-cutting for single-engine Tejas fighter planes to begin in February
Two more years for the first flight and four more for flight testing with 4 prototypes. If they could deliver by 2026-27 it would be impressive.
 
but we need amca rather than mk2 ,becoz by 26-27 time frame Korean and Turkish 5th gen up in air possibly Pakistanis get green painted j31
 
but we need amca rather than mk2 ,becoz by 26-27 time frame Korean and Turkish 5th gen up in air possibly Pakistanis get green painted j31

Our total requirement is 850-1000 jets for the IAF alone, and, out of that, we need next gen aircraft to be around 250 jets. So there's still room for 600+ 4th gen jets.