Here is the video, contains one of the above fin part making/finishing.
So spike or atgm 5??Imp details
Total requirements: 5000 ATGMs & 500 Launchers
Production Rate : 1750 ATGMs/year & 175 launchers/year
Usage :- Plains & mountains till 5500 meters
Targets :- should be able to destroy enemy tanks, Armoured Personnel Carriers, combat vehicles, low flying helicopters
Service Life :- 15 years (25 Years extended)
Modes :- Top attack & Direct attack
Dimensions:- Less than 125mm dia
Less than 1.25 m in length
Less than 25 (missile & launcher combined)
Range :- Max 5 km+ , Min 200 meters for direct attack & 1.1km for Top Attack
125mm restrictions.So spike or atgm 5??
They want something like SAMHO, LAHAT etc.125mm restrictions.
I don't know why Army is putting this restriction. Since Konkurs is 135mm dia system, so at the very minimum a 135mm specification will allow both Javelin (127mm) and Spike 130mm.
MMP 140mm so that's out125mm restrictions.
I don't know why Army is putting this restriction. Since Konkurs is 135mm dia system, so at the very minimum a 135mm specification will allow both Javelin (127mm) and Spike 130mm.
+ - 5% always applies, this is tentative spec as well I guess. Some of our bmp already seems to have some atgm installed? This old thread had some info125mm restrictions.
I don't know why Army is putting this restriction. Since Konkurs is 135mm dia system, so at the very minimum a 135mm specification will allow both Javelin (127mm) and Spike 130mm.
wth is samho tube launched or gun launched? there must be many modern options , spike javellin any can do, even BDL amogha imo would get a shot despite that spec.They want something like SAMHO, LAHAT etc.
The Missile+ launcher weight should be less than 25kg too. I don't know much about the mmp. But it seems it will have a problem with that too.MMP 140mm so that's out
wth is samho tube launched or gun launched? there must be many modern options , spike javellin any can do, even BDL amogha imo would get a shot despite that spec.
So far we have tested the CLGM after a brief timeout, and there is yet no sign of DRDO working hard on Samho. MPATGM on other hand is a MM project, and going full speed ahead. Several tenders, think we even got one with entire drawings of the article and propulsion doc. So would love to see if Samho really returns to the fold again.
Range of MPATGM is much less than the requirements so, i dnt think it is desired. LAHAT or SAMHO seems to be fulfilling the requirements.So far we have tested the CLGM after a brief timeout, and there is yet no sign of DRDO working hard on Samho. MPATGM on other hand is a MM project, and going full speed ahead. Several tenders, think we even got one with entire drawings of the article and propulsion doc. So would love to see if Samho really returns to the fold again.
Fire & Forget with Top Attack Capability has been demanded.Range of MPATGM is much less than the requirements so, i dnt think it is desired. LAHAT or SAMHO seems to be fulfilling the requirements.
true, vehicle mounted atgm would certainly want a higher range compared to manpad/atgm fired by normal soldiers. lets see what they get.Range of MPATGM is much less than the requirements so, i dnt think it is desired. LAHAT or SAMHO seems to be fulfilling the requirements.
Source of the pics and the video were here, company's websiteHere is the video, contains one of the above fin part making/finishing.
These expected timelines are so bad. It shows how the procurement process is still so convoluted and bureaucratic even for an indian developed project. No fundamental reforms happened in this regard last 9 years of this government.So, cross-posting again here, order expected timeline shared by BDL is below, note this is forward looking projection & may not come absolute true.
View attachment 28163
View attachment 28164
Interesting that Spike ER2 order is expected this FY
View attachment 28165
View attachment 28166
Weren't they saying the expected order for QRSAM was supposed to come in 2024. Now it is 25.So, cross-posting again here, order expected timeline shared by BDL is below, note this is forward looking projection & may not come absolute true.
View attachment 28163
View attachment 28164
Interesting that Spike ER2 order is expected this FY
View attachment 28165
View attachment 28166